OSHA SearchOSHA records by employer

SRV Homes, LLC: OSHA inspections and violations

Baltimore, Maryland · Framing Contractors · NAICS 238130

1inspections
4citation items
$3,000current penalties
Jun 21, 2017last inspection

OSHA inspectors have visited SRV Homes, LLC in Maryland one time.

It opened on Jun 21, 2017 as a planned inspection, in Baltimore and is still open.

In all, OSHA issued 4 citation items: 3 serious and 1 other-than-serious.

The penalties, $3,000 in total, stand where OSHA first set them.

Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. SRV Homes, LLC averages $3,000 across 1 cited inspection.

SRV Homes, LLC: OSHA citation items per year, 2017 to 2017
Citation items per year, by inspection date.

Maryland · latest 90 days of OSHA records

197employers cited

21 of them in the same industry

Get notified the morning OSHA posts each new citation in Maryland: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Maryland

Checking a subcontractor, a client or your own company? Watch SRV Homes, LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 342414927 OPENED JUN 21, 2017Open

Planned · Complete · Safety · 4 employees at the site · Open

3400 Mueller Street, Baltimore, MD 21206 · Framing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.403(b)(2) · Electrical equipment on job sites
Serious$900$900Oct 12, 2017Final
Citation 1, item 2
29 CFR 1926.416(a)(1) · Electrical safety in construction
Serious$1,050$1,050Oct 12, 2017Final
Citation 1, item 3
29 CFR 1926.501(b)(13) · Fall protection in construction
Serious$1,050$1,050Oct 12, 2017Final
Citation 2, item 1
29 CFR 1926.405(g)(2)(iv) · Job-site wiring
Other-than-serious$0$0Oct 12, 2017Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.403 · Electrical equipment on job sites

29 CFR 1926.403(b)(2)

(2) Installation and use. Listed, labeled, or certified equipment shall be installed and used in accordance with instructions included in the listing, labeling, or certification.

29 CFR 1926.405 · Job-site wiring

29 CFR 1926.405(g)(2)(iv)

(iv) Strain relief. Flexible cords shall be connected to devices and fittings so that strain relief is provided which will prevent pull from being directly transmitted to joints or terminal screws.

29 CFR 1926.416 · Electrical safety in construction

29 CFR 1926.416(a)(1)

(a) Protection of employees. (1) No employer shall permit an employee to work in such proximity to any part of an electric power circuit that the employee could contact the electric power circuit in the course of work, unless the employee is protected against electric shock by deenergizing the circuit and grounding it or by guarding it effectively by insulation or other means.

29 CFR 1926.501 · Fall protection in construction

Other framing contractors employers in Maryland

Alert subscribers get notified of each newly cited employer in Maryland the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.