OSHA SearchOSHA records by employer

SSW Erectors, LLC: OSHA inspections and violations

Watertown, New York · Structural Steel and Precast Concrete Contractors · NAICS 238120

3inspections
4citation items
$11,130current penalties
Feb 5, 2019last inspection

SSW Erectors, LLC has 3 OSHA inspections on record in New York, the first in 2007.

OSHA's last visit started on Feb 5, 2019 on a referral, in Latham.

Across those inspections OSHA issued 4 citation items: 3 serious and 1 other-than-serious.

OSHA proposed $13,110 in penalties. After settlements and reviews the total is $11,130, down 15%.

For context, across all construction employers the median penalty per cited inspection since 2015 is $3,080. SSW Erectors, LLC averages $6,630 over 1 cited inspection in that time.

It reported 1 severe injury to OSHA since 2015.

SSW Erectors, LLC: OSHA citation items per year, 2007 to 2019
Citation items per year, by inspection date.

New York · latest 90 days of OSHA records

353employers cited

Get notified the morning OSHA posts each new citation in New York: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in New York

Checking a subcontractor, a client or your own company? Watch SSW Erectors, LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 343761482 OPENED FEB 5, 2019Closed

Referral · Partial · Safety · 40 employees at the site · Closed Jul 5, 2019

629 Columbia St. Ext., Latham, NY 12110 · Structural Steel and Precast Concrete Contractors · OSHA's record · Phone and website on Google Maps

Incident on Jan 31, 2019: Employee receives pelvis fracture in fall from hoisted load

At 11:45 p.m. on January 31, 2019, an employee worked as a rigger/signalman and attached rigging gear to steel joints. The employee then signaled the crane operator to lift the load. The load was raised and the employee became entangled in the tagline and lifted into the air. At some point, the employee was able to get untangled and fell eight feet. The employee received a fractured pelvis and was hospitalized for treatment.

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.251(c)(16) · Rigging equipment for material handling
Other-than-serious$6,630$6,630May 23, 2019Final

Inspection 313761652 OPENED NOV 24, 2010Closed

Planned · Partial · Safety · 13 employees at the site · Closed Jul 25, 2011

29 Consumer Square, Plattsburgh, NY 12901 · Structural Steel and Precast Concrete Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.451(e)(1) · Scaffolds, general requirements
Serious$2,700$1,890Apr 6, 2011Closed
Citation 1, item 1b
29 CFR 1926.454(c)(3) · Scaffold training
Serious$0$0Apr 6, 2011Closed
Citation 1, item 2 Serious$3,780$2,610Apr 6, 2011Closed

Inspection 310751706 OPENED OCT 18, 2007Closed

Unprogrammed other · Complete · Safety · 6 employees at the site · Closed Oct 22, 2007

142 Mechanic Street, Watertown, NY 13601 · Structural Steel and Precast Concrete Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Severe injury reports

Employers must report any work-related amputation, in-patient hospitalization or loss of an eye to OSHA within 24 hours. 1 report on file.

Jan 31, 2019, Latham: Hospitalization · fractures · pelvis

An employee was attaching rigging gear to steel joists during crane operations. When the load was lifted his foot was entangled in the tagline and the employee was lifted to a height of approximately eight feet. The employee freed himself and dropped to the ground fracturing his pelvis.

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.251 · Rigging equipment for material handling

29 CFR 1926.251(c)(16)

(c) Wire rope. (1) Employers must not use improved plow-steel wire rope and wire-rope slings with loads in excess of the rated capacities (i.e., working load limits) indicated on the sling by permanently affixed and legible identification markings prescribed by the manufacturer.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(e)(1)

(1) When scaffold platforms are more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from another scaffold, structure, personnel hoist, or similar surface shall be used. Crossbraces shall not be used as a means of access.

29 CFR 1926.454 · Scaffold training

29 CFR 1926.454(c)(3)

(3) Where inadequacies in an affected employee's work involving scaffolds indicate that the employee has not retained the requisite proficiency.

29 CFR 1926.761 · Training

Other structural steel and precast concrete contractors employers in New York

Alert subscribers get notified of each newly cited employer in New York the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.