4inspections
8citation items
$10,200current penalties
Mar 13, 2026last inspection

OSHA has inspected Stead Sheet Metal Inc. 4 times in Illinois since 2009.

The latest one began on Mar 13, 2026 as a planned inspection, in Niles.

Those inspections ended with 8 citation items: 6 serious and 2 repeat.

Penalties were first proposed at $21,480 and now stand at $10,200, 53% lower after settlements or reviews.

Scaffolds, general requirements comes up most often in these citations: 8 items under 1926.451.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and Stead Sheet Metal Inc. averages $3,300 (1 cited inspection).

Stead Sheet Metal Inc.: OSHA citation items per year, 2009 to 2026
Citation items per year, by inspection date.

Illinois · latest 90 days of OSHA records

423employers cited

Get notified the morning OSHA posts each new citation in Illinois: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Illinois

Checking a subcontractor, a client or your own company? Watch Stead Sheet Metal Inc. and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 348807801 OPENED MAR 13, 2026Closed

Planned · No inspection · Safety · Closed Mar 13, 2026

6400 W. Touhy Ave., Niles, IL · Sheet Metal Work Manufacturing · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 340750470 OPENED JUL 2, 2015Closed

Planned · Partial · Safety · 6 employees at the site · Closed Jul 15, 2016

1599 Farnsworth Ave., Aurora, IL 60504 · Sheet Metal Work Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.451(e)(1) · Scaffolds, general requirements
Serious$2,200$1,650Nov 19, 2015Final
Citation 2, item 1
29 CFR 1926.451(b)(1) · Scaffolds, general requirements
Serious$4,400$1,650Nov 19, 2015Final

Inspection 315180919 OPENED JAN 25, 2011Closed

Planned · Partial · Safety · 10 employees at the site · Closed Nov 14, 2011

2214 N. Bissell, Chicago, IL 60614 · Other Building Finishing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.451(c)(1)(ii) · Scaffolds, general requirements
Serious$2,640$1,200Mar 14, 2011Closed
Citation 2, item 1a
29 CFR 1926.451(b)(1) · Scaffolds, general requirements
Repeat$9,240$4,200Mar 14, 2011Closed
Citation 2, item 1b
29 CFR 1926.451(g)(1) · Scaffolds, general requirements
Repeat$0$0Mar 14, 2011Closed

Inspection 313931503 OPENED DEC 8, 2009Closed

Planned · Partial · Safety · 2 employees at the site · Closed May 13, 2010

1447 W. Taylor St., Chicago, IL 60616 · Other Building Finishing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.451(b)(1) · Scaffolds, general requirements
Serious$1,500$750Jan 6, 2010Closed
Citation 1, item 1b
29 CFR 1926.451(g)(1) · Scaffolds, general requirements
Serious$0$0Jan 6, 2010Closed
Citation 1, item 2
29 CFR 1926.451(f)(7) · Scaffolds, general requirements
Serious$1,500$750Jan 6, 2010Closed

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(b)(1)

(b) Scaffold platform construction. (1) Each platform on all working levels of scaffolds shall be fully planked or decked between the front uprights and the guardrail supports as follows:

29 CFR 1926.451(c)(1)(ii)

(ii) Guys, ties, and braces shall be installed according to the scaffold manufacturer's recommendations or at the closest horizontal member to the 4:1 height and be repeated vertically at locations of horizontal members every 20 feet (6.1 m) or less thereafter for scaffolds 3 feet (0.91 m) wide or less, and every 26 feet (7.9 m) or less thereafter for scaffolds greater than 3 feet (0.91 m) wide. The top guy, tie or brace of completed scaffolds shall be placed no further than the 4:1 height from the top. Such guys, ties and braces shall be installed at each end of the scaffold and at horizontal intervals not to exceed 30 feet (9.1 m) (measured from one end [not both] towards the other).

29 CFR 1926.451(e)(1)

(1) When scaffold platforms are more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from another scaffold, structure, personnel hoist, or similar surface shall be used. Crossbraces shall not be used as a means of access.

Other other building finishing contractors employers in Illinois

Alert subscribers get notified of each newly cited employer in Illinois the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.