OSHA SearchOSHA records by employer

Stokes Brothers Construction, LLC: OSHA inspections and violations

South Boston, Virginia · Structural Steel and Precast Concrete Contractors · NAICS 238120

1inspections
2citation items
$844current penalties
Sep 2, 2022last inspection

OSHA has inspected Stokes Brothers Construction, LLC once in Virginia.

The inspection began on Sep 2, 2022, in South Boston.

That inspection ended with 2 citation items: 2 serious.

Penalties were first proposed at $1,205 and now stand at $844, 30% lower after settlements or reviews.

Arc welding and cutting comes up most often in these citations: 2 items under 1926.351.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and Stokes Brothers Construction, LLC averages $844 (1 cited inspection).

Stokes Brothers Construction, LLC: OSHA citation items per year, 2022 to 2022
Citation items per year, by inspection date.

Virginia · latest 90 days of OSHA records

250employers cited

4 of them in the same industry

Get notified the morning OSHA posts each new citation in Virginia: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Virginia

Checking a subcontractor, a client or your own company? Watch Stokes Brothers Construction, LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 346195225 OPENED SEP 2, 2022Closed

Unprogrammed other · Complete · Safety · 7 employees at the site · Closed Apr 12, 2023

3346 Halifax Road, South Boston, VA 24592 · Structural Steel and Precast Concrete Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.351(b)(2) · Arc welding and cutting
Serious$1,205$844Oct 24, 2022Final
Citation 1, item 1b
29 CFR 1926.351(b)(4) · Arc welding and cutting
Serious$0$0Oct 24, 2022Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.351 · Arc welding and cutting

29 CFR 1926.351(b)(2)

(2) Only cable free from repair or splices for a minimum distance of 10 feet from the cable end to which the electrode holder is connected shall be used, except that cables with standard insulated connectors or with splices whose insulating quality is equal to that of the cable are permitted.

29 CFR 1926.351(b)(4)

(4) Cables in need of repair shall not be used. When a cable, other than the cable lead referred to in paragraph (b)(2) of this section, becomes worn to the extent of exposing bare conductors, the portion thus exposed shall be protected by means of rubber and friction tape or other equivalent insulation.

Other structural steel and precast concrete contractors employers in Virginia

Alert subscribers get notified of each newly cited employer in Virginia the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.