Inspection 349043828 OPENED JUL 8, 2026Closed
North 8th Ave., Baldwin, WI 54002 · Site Preparation Contractors · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
OSHA has inspected Stout Construction Inc. 3 times in Wisconsin since 2023.
The latest one began on Jul 8, 2026, in Baldwin.
Those inspections ended with 3 citation items: 1 serious and 2 other-than-serious.
Penalties were first proposed at $4,113 and still stand at $7,904.
Trench protection comes up most often in these citations: 2 items under 1926.652.
How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and Stout Construction Inc. averages $7,904 (1 cited inspection).
Wisconsin · latest 90 days of OSHA records
231employers cited
5 of them in the same industry
Get notified the morning OSHA posts each new citation in Wisconsin: the employer, the site address, the rules broken and the penalty.
See who gets cited nextLatest cited in Wisconsin
Checking a subcontractor, a client or your own company? Watch Stout Construction Inc. and get notified the morning OSHA posts a new citation for it.
Watch this companyNorth 8th Ave., Baldwin, WI 54002 · Site Preparation Contractors · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
Intersection Of Ash Street And 1st Street, Spooner, WI 54801 · Site Preparation Contractors · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
E6091 578th Ave., Menomonie, WI 54751 · Site Preparation Contractors · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1b 29 CFR 1926.652(c)(4)(i) · Trench protection |
Serious | $0 | $7,904 | Jan 19, 2024 | Final |
| Citation 1, item 1c 29 CFR 1926.652(g)(2) · Trench protection |
Other-than-serious | $0 | $0 | Jan 19, 2024 | Final |
| Citation 1, item 2 29 CFR 1926.1053(b)(1) · Ladders in construction |
Other-than-serious | $4,113 | $0 | Jan 19, 2024 | Final |
Current text from the Code of Federal Regulations. Some citations were issued under older wording.
29 CFR 1926.1053(b)(1)
(1) When portable ladders are used for access to an upper landing surface, the ladder side rails shall extend at least 3 feet (.9 m) above the upper landing surface to which the ladder is used to gain access; or, when such an extension is not possible because of the ladder's length, then the ladder shall be secured at its top to a rigid support that will not deflect, and a grasping device, such as a grabrail, shall be provided to assist employees in mounting and dismounting the ladder. In no case shall the extension be such that ladder deflection under a load would, by itself, cause the ladder to slip off its support.
29 CFR 1926.652(c)(4)(i)
(4) Option (4)—Design by a registered professional engineer. (i) Support systems, shield systems, and other protective systems not utilizing Option 1, Option 2 or Option 3, above, shall be approved by a registered professional engineer.
29 CFR 1926.652(g)(2)
(2) Additional requirement for shield systems used in trench excavations. Excavations of earth material to a level not greater than 2 feet (.61 m) below the bottom of a shield shall be permitted, but only if the shield is designed to resist the forces calculated for the full depth of the trench, and there are no indications while the trench is open of a possible loss of soil from behind or below the bottom of the shield.
Alert subscribers get notified of each newly cited employer in Wisconsin the morning it is posted. See the alert plans.
Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.