OSHA SearchOSHA records by employer

Suncoast Speed Shop, Inc: OSHA inspections and violations

Tampa, Florida · Finish Carpentry Contractors · NAICS 238350

1inspections
2citation items
$0current penalties
Nov 19, 2019last inspection

Suncoast Speed Shop, Inc has one OSHA inspection on record in Florida.

OSHA opened it on Nov 19, 2019 as part of a related case, in Tampa.

From that inspection OSHA issued 2 citation items: 2 other-than-serious.

OSHA did not attach a penalty to any of these citations.

For context, across all construction employers the median penalty per cited inspection since 2015 is $3,080. Suncoast Speed Shop, Inc averages $0 over 1 cited inspection in that time.

Suncoast Speed Shop, Inc: OSHA citation items per year, 2019 to 2019
Citation items per year, by inspection date.

Florida · latest 90 days of OSHA records

319employers cited

Get notified the morning OSHA posts each new citation in Florida: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Florida

Checking a subcontractor, a client or your own company? Watch Suncoast Speed Shop, Inc and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 344456249 OPENED NOV 19, 2019Closed

Programmed related · Partial · Safety · 2 employees at the site · Closed Mar 26, 2020

5426 Bay Center Dr, Tampa, FL 33609 · Finish Carpentry Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.404(b)(1)(i) · Ground-fault protection on job sites
Other-than-serious$0$0Jan 3, 2020Final
Citation 1, item 2
29 CFR 1926.405(b)(2) · Job-site wiring
Other-than-serious$0$0Jan 3, 2020Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.404 · Ground-fault protection on job sites

29 CFR 1926.404(b)(1)(i)

(b) Branch circuits—(1) Ground-fault protection—(i) General. The employer shall use either ground fault circuit interrupters as specified in paragraph (b)(1)(ii) of this section or an assured equipment grounding conductor program as specified in paragraph (b)(1)(iii) of this section to protect employees on construction sites. These requirements are in addition to any other requirements for equipment grounding conductors.

29 CFR 1926.405 · Job-site wiring

29 CFR 1926.405(b)(2)

(2) Covers and canopies. All pull boxes, junction boxes, and fittings shall be provided with covers. If metal covers are used, they shall be grounded. In energized installations each outlet box shall have a cover, faceplate, or fixture canopy. Covers of outlet boxes having holes through which flexible cord pendants pass shall be provided with bushings designed for the purpose or shall have smooth, well-rounded surfaces on which the cords may bear.

Other finish carpentry contractors employers in Florida

Alert subscribers get notified of each newly cited employer in Florida the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.