OSHA SearchOSHA records by employer

Sunrise Creek Pumping LLC: OSHA inspections and violations

Madisonville, Texas · Poured Concrete Foundation and Structure Contractors · NAICS 238110

1inspections
2citation items
$10,724current penalties
Aug 8, 2025last inspection

OSHA inspectors have visited Sunrise Creek Pumping LLC in Texas one time.

It opened on Aug 8, 2025 on a referral, in Madisonville and is still open.

In all, OSHA issued 2 citation items: 2 serious.

The proposed penalties came to $23,832; today they stand at $10,724, 55% less.

The rule cited most here is 1926.600 (equipment), 2 times.

Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. Sunrise Creek Pumping LLC averages $10,724 across 1 cited inspection.

Sunrise Creek Pumping LLC: OSHA citation items per year, 2025 to 2025
Citation items per year, by inspection date.

Texas · latest 90 days of OSHA records

399employers cited

7 of them in the same industry

Get notified the morning OSHA posts each new citation in Texas: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Texas

Checking a subcontractor, a client or your own company? Watch Sunrise Creek Pumping LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 348429879 OPENED AUG 8, 2025Open

Referral · Partial · Safety · 4 employees at the site · Open

605 East Main Street, Madisonville, TX 77864 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a Serious$11,916$10,724Jan 30, 2026Final
Citation 1, item 1b Serious$11,916$0Jan 30, 2026Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.600 · Equipment

29 CFR 1926.600(a)(6)(i)

(i) For lines rated 50 kV or below, minimum clearance between the lines and any part of the crane or load shall be 10 feet;

29 CFR 1926.600(a)(6)(iv)

(iv) A person shall be designated to observe clearance of the equipment and give timely warning for all operations where it is difficult for the operator to maintain the desired clearance by visual means;

Other poured concrete foundation and structure contractors employers in Texas

Alert subscribers get notified of each newly cited employer in Texas the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.