OSHA SearchOSHA records by employer

TBC Contractors, LLC: OSHA inspections and violations

Washington, District of Columbia · Finish Carpentry Contractors · NAICS 238350

1inspections
6citation items
$7,483current penalties
May 20, 2016last inspection

OSHA inspectors have visited TBC Contractors, LLC in District of Columbia one time.

It opened on May 20, 2016 as a planned inspection, in Washington.

In all, OSHA issued 6 citation items: 6 serious.

The penalties, $7,483 in total, stand where OSHA first set them.

The rule cited most here is 1926.1052 (stairways in construction), 3 times.

Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. TBC Contractors, LLC averages $7,483 across 1 cited inspection.

TBC Contractors, LLC: OSHA citation items per year, 2016 to 2016
Citation items per year, by inspection date.

District of Columbia · latest 90 days of OSHA records

14employers cited

Get notified the morning OSHA posts each new citation in District of Columbia: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in District of Columbia

Checking a subcontractor, a client or your own company? Watch TBC Contractors, LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 341553071 OPENED MAY 20, 2016Closed

Planned · Complete · Safety · 5 employees at the site · Closed Apr 6, 2023

4022 Mckinley St., Nw, Washington, DC 20015 · Finish Carpentry Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.403(b)(2) · Electrical equipment on job sites
Serious$2,138$2,138Aug 5, 2016Final
Citation 1, item 1b
29 CFR 1926.405(b)(2) · Job-site wiring
Serious$0$0Aug 5, 2016Final
Citation 1, item 2
29 CFR 1926.501(b)(13) · Fall protection in construction
Serious$2,138$2,138Aug 5, 2016Final
Citation 1, item 3a
29 CFR 1926.1052(b)(3) · Stairways in construction
Serious$3,207$3,207Aug 5, 2016Final
Citation 1, item 3b
29 CFR 1926.1052(c)(1)(i) · Stairways in construction
Serious$0$0Aug 5, 2016Final
Citation 1, item 3c
29 CFR 1926.1052(c)(1)(ii) · Stairways in construction
Serious$0$0Aug 5, 2016Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.1052 · Stairways in construction

29 CFR 1926.1052(b)(3)

(3) Treads for temporary service shall be made of wood or other solid material, and shall be installed the full width and depth of the stair.

29 CFR 1926.1052(c)(1)(i)

(i) At least one handrail; and

29 CFR 1926.1052(c)(1)(ii)

(ii) One stairrail system along each unprotected side or edge.

29 CFR 1926.403 · Electrical equipment on job sites

29 CFR 1926.405 · Job-site wiring

29 CFR 1926.501 · Fall protection in construction

Other finish carpentry contractors employers in District of Columbia

Alert subscribers get notified of each newly cited employer in District of Columbia the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.