Inspection 346862451 OPENED JUL 27, 2023Closed
2525 Bells Road, Richmond, VA 23234 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
OSHA has inspected Technical Partners LLC 5 times in Virginia since 2016.
The latest one began on Jul 27, 2023 on a referral, in Richmond.
Those inspections ended with 6 citation items: 5 serious and 1 other-than-serious.
Penalties were first proposed at $1,875 and now stand at $1,659, 12% lower after settlements or reviews.
Scaffolds, general requirements comes up most often in these citations: 3 items under 1926.451.
How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,079, and Technical Partners LLC averages $830 (2 cited inspections).
Want to know if OSHA cites Technical Partners LLC again? Add it to a watchlist and we will email you the morning the citation shows up.
Watch this company2525 Bells Road, Richmond, VA 23234 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
28a Boatwright Dr., Richmond, VA 23226 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
11701 Ironbridge Road, Chester, VA 23831 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 16VAC25-60-130 |
Serious | $720 | $504 | Mar 7, 2017 | Final |
| Citation 2, item 1 29 CFR 16VAC25-160-10.C.3 |
Other-than-serious | $0 | $0 | Mar 7, 2017 | Final |
11701 Ironbridge Road, Chester, VA 23831 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
8110 Orcutt Avenue, Newport News, VA 23605 · Power and Communication Line and Related Structures Construction · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1a 29 CFR 16VAC25-60-130 |
Serious | $1,155 | $1,155 | Dec 6, 2016 | Final |
| Citation 1, item 1b 29 CFR 1926.451(a)(1) · Scaffolds, general requirements |
Serious | $0 | $0 | Dec 6, 2016 | Final |
| Citation 1, item 1c 29 CFR 1926.451(b)(1)(i) · Scaffolds, general requirements |
Serious | $0 | $0 | Dec 6, 2016 | Final |
| Citation 1, item 1d 29 CFR 1926.451(c)(2)(v) · Scaffolds, general requirements |
Serious | $0 | $0 | Dec 6, 2016 | Final |
Current text from the Code of Federal Regulations. Some citations were issued under older wording.
29 CFR 1926.451(a)(1)
(a) Capacity. (1) Except as provided in paragraphs (a)(2), (a)(3), (a)(4), (a)(5) and (g) of this section, each scaffold and scaffold component shall be capable of supporting, without failure, its own weight and at least 4 times the maximum intended load applied or transmitted to it.
29 CFR 1926.451(b)(1)(i)
(i) Each platform unit (e.g., scaffold plank, fabricated plank, fabricated deck, or fabricated platform) shall be installed so that the space between adjacent units and the space between the platform and the uprights is no more than 1 inch (2.5 cm) wide, except where the employer can demonstrate that a wider space is necessary (for example, to fit around uprights when side brackets are used to extend the width of the platform).
29 CFR 1926.451(c)(2)(v)
(v) Fork-lifts shall not be used to support scaffold platforms unless the entire platform is attached to the fork and the fork-lift is not moved horizontally while the platform is occupied.
Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.