OSHA SearchOSHA records by employer

Tekton Construction Corp.: OSHA inspections and violations

Coral Gables, Florida · Other Foundation, Structure, and Building Exterior Contractors · NAICS 238190

4inspections
5citation items
$12,604current penalties
May 9, 2019last inspection

OSHA has inspected Tekton Construction Corp. 4 times in Florida since 2016.

The latest one began on May 9, 2019 on a referral, in Miami Beach.

Those inspections ended with 5 citation items: 5 serious.

Penalties were first proposed at $23,792 and now stand at $12,604, 47% lower after settlements or reviews.

Hazard communication comes up most often in these citations: 3 items under 1910.1200.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and Tekton Construction Corp. averages $6,302 (2 cited inspections).

It reported 4 severe injuries to OSHA since 2015.

Tekton Construction Corp.: OSHA citation items per year, 2016 to 2019
Citation items per year, by inspection date.

Want to know if OSHA cites Tekton Construction Corp. again? Add it to a watchlist and we will email you the morning the citation shows up.

Watch this company

Inspection history

Inspection 343994463 OPENED MAY 9, 2019Closed

Referral · Partial · Health · 25 employees at the site · Closed Jun 19, 2019

931 Washington Ave, Miami Beach, FL 33139 · Other Foundation, Structure, and Building Exterior Contractors · OSHA's record · Phone and website on Google Maps

Incident on May 4, 2019: Employee is sickened by ingestion of concrete sealant

At 8:00 a.m. on May 4, 2019, Employee #1 and a coworker, employed by a construction company, were pouring and leveling concrete at the site of a new commercial building. Employee #1 attempted to spray the concrete with a sealant, E-cure, and inadvertently ingested the chemical. Employee #1 was transported to the hospital and admitted for treatment of this chemical exposure.

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.1200(f)(6)(ii) · Hazard communication
Serious$3,220$1,932May 20, 2019Final
Citation 1, item 2
29 CFR 1926.152(b)(2) · Flammable liquids
Serious$3,864$2,318May 20, 2019Final

Inspection 343912283 OPENED APR 5, 2019Closed

Programmed related · Partial · Safety · 7 employees at the site · Closed Oct 22, 2019

1300 West Avenue, Miami Beach, FL 33140 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps

Incident on Feb 5, 2019: Employee falls from ladder and fractures ankle

At 12:00 p.m. on February 5, 2019, Employee #1, employed by a concrete construction company, was working at a new commercial building project. He was climbing down a ladder constructed at the jobsite when he slipped and fell. The employee required hospitalization and treatment for a fractured right ankle.

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1910.1200(e)(2) · Hazard communication
Serious$8,354$4,177Aug 8, 2019Final
Citation 1, item 1b
29 CFR 1910.1200(g)(1) · Hazard communication
Serious$0$0Aug 8, 2019Final
Citation 1, item 2
29 CFR 1926.95(a) · Criteria for personal protective equipment
Serious$8,354$4,177Aug 8, 2019Final

Inspection 342021912 OPENED JAN 12, 2017Closed

Referral · Partial · Safety · 100 employees at the site · Closed Feb 15, 2017

2222 Ponce De Leon Blvd., Coral Gables, FL 33134 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps

Incident on Jan 10, 2017: Employee falls from height and is injured

At approximately 9:00 a.m. on January 10, 2017, Employee #1 was hammering nails from an elevated position. He felt his yo-yo lanyard, which was bothering him as he worked. Employee #1 decided to remove the yo-yo lanyard for a moment to hammer a nail. While hammering, he lost his balance and fell from the height. Employee #1 struck the ground, fractured his eye socket and injured both of his wrists. Employee #1 was transported to a medical center, where he received treatment and was hospitalized.

No citations from this inspection.

Inspection 341976348 OPENED DEC 14, 2016Closed

Referral · Partial · Safety · 100 employees at the site · Closed Dec 30, 2016

2222 Ponce De Leon Blvd, Coral Gables, FL 33134 · Other Foundation, Structure, and Building Exterior Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Severe injury reports

Employers must report any work-related amputation, in-patient hospitalization or loss of an eye to OSHA within 24 hours. 4 reports on file.

May 4, 2019, Miami Beach: Hospitalization · soreness, pain, hurt-nonspecified injury · head and trunk

An employee was siphoning curing compound and inadvertently swallowed some, causing him to vomit. The employee was hospitalized with mouth and stomach pain.

Feb 5, 2019, Miami Beach: Hospitalization · fractures · ankle(s)

An employee was descending a jobsite-made ladder when he slipped and fell, breaking his right ankle.

Jan 10, 2017, Coral Gables: Hospitalization · soreness, pain, hurt-nonspecified injury · multiple body parts, n.e.c.

An employee fell approximately 10 feet while removing formwork, suffering trauma to both arms, the face, and the torso.

Dec 10, 2016, Coral Gables: Amputation · amputations · fingertip(s)

On December 10, 2016, at 9:30 a.m., an employee was removing shoring equipment when his right thumb tip was pinched and amputated between shoring and an I-beam.

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.1200 · Hazard communication

29 CFR 1910.1200(e)(2)

(2) Multi-employer workplaces. Employers who produce, use, or store hazardous chemicals at a workplace in such a way that the employees of other employer(s) may be exposed (for example, employees of a construction contractor working on-site) shall additionally ensure that the hazard communication programs developed and implemented under this paragraph (e) include the following:

29 CFR 1910.1200(f)(6)(ii)

(ii) Product identifier and words, pictures, symbols, or combination thereof, which provide at least general information regarding the hazards of the chemicals, and which, in conjunction with the other information immediately available to employees under the hazard communication program, will provide employees with the specific information regarding the physical and health hazards of the hazardous chemical.

29 CFR 1910.1200(g)(1)

(g) Safety data sheets. (1) Chemical manufacturers and importers shall obtain or develop a safety data sheet for each hazardous chemical they produce or import. Employers shall have a safety data sheet in the workplace for each hazardous chemical which they use.

29 CFR 1926.152 · Flammable liquids

29 CFR 1926.95 · Criteria for personal protective equipment

Other other foundation, structure, and building exterior contractors employers in Florida

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.