OSHA SearchOSHA records by employer

Temporary Construction Power: OSHA inspections and violations

Centerville, Utah · Electrical Contractors and Other Wiring Installation Contractors · NAICS 238210

1inspections
3citation items
$0current penalties
May 5, 2020last inspection

OSHA has inspected Temporary Construction Power once in Utah.

The inspection began on May 5, 2020 as a planned inspection, in Centerville.

That inspection ended with 3 citation items: 3 other-than-serious.

None of the citations carried a penalty.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,079, and Temporary Construction Power averages $0 (1 cited inspection).

Temporary Construction Power: OSHA citation items per year, 2020 to 2020
Citation items per year, by inspection date.

Want to know if OSHA cites Temporary Construction Power again? Add it to a watchlist and we will email you the morning the citation shows up.

Watch this company

Inspection history

Inspection 344742127 OPENED MAY 5, 2020Closed

Planned · Partial · Safety · 1 employee at the site · Closed Jun 22, 2020

300 East Pages Ln, Centerville, UT 84014 · Electrical Contractors and Other Wiring Installation Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.403(b)(2) · Electrical equipment on job sites
Other-than-serious$0$0Jun 11, 2020Final
Citation 1, item 1b
29 CFR 1926.404(b)(1)(i) · Ground-fault protection on job sites
Other-than-serious$0$0Jun 11, 2020Final
Citation 1, item 1c
29 CFR 1926.405(b)(1) · Job-site wiring
Other-than-serious$0$0Jun 11, 2020Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.403 · Electrical equipment on job sites

29 CFR 1926.403(b)(2)

(2) Installation and use. Listed, labeled, or certified equipment shall be installed and used in accordance with instructions included in the listing, labeling, or certification.

29 CFR 1926.404 · Ground-fault protection on job sites

29 CFR 1926.404(b)(1)(i)

(b) Branch circuits—(1) Ground-fault protection—(i) General. The employer shall use either ground fault circuit interrupters as specified in paragraph (b)(1)(ii) of this section or an assured equipment grounding conductor program as specified in paragraph (b)(1)(iii) of this section to protect employees on construction sites. These requirements are in addition to any other requirements for equipment grounding conductors.

29 CFR 1926.405 · Job-site wiring

29 CFR 1926.405(b)(1)

(b) Cabinets, boxes, and fittings—(1) Conductors entering boxes, cabinets, or fittings. Conductors entering boxes, cabinets, or fittings shall be protected from abrasion, and openings through which conductors enter shall be effectively closed. Unused openings in cabinets, boxes, and fittings shall also be effectively closed.

Other electrical contractors and other wiring installation contractors employers in Utah

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.