OSHA SearchOSHA records by employer

Tolbert Plastering, Inc: OSHA inspections and violations

Rome, Georgia · Tile and Terrazzo Contractors · NAICS 238340

6inspections
6citation items
$3,514current penalties
Jul 11, 2018last inspection

OSHA has inspected Tolbert Plastering, Inc 6 times in Georgia since 1973.

The latest one began on Jul 11, 2018 as a planned inspection, in Helen.

Those inspections ended with 6 citation items: 4 serious and 2 other-than-serious.

Penalties were first proposed at $4,456 and now stand at $3,514, 21% lower after settlements or reviews.

Scaffolds, general requirements comes up most often in these citations: 2 items under 1926.451.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and Tolbert Plastering, Inc averages $1,414 (1 cited inspection).

Tolbert Plastering, Inc: OSHA citation items per year, 1973 to 2018
Citation items per year, by inspection date.

Georgia · latest 90 days of OSHA records

138employers cited

Get notified the morning OSHA posts each new citation in Georgia: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Georgia

Checking a subcontractor, a client or your own company? Watch Tolbert Plastering, Inc and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 343298774 OPENED JUL 11, 2018Closed

Planned · Complete · Safety · 6 employees at the site · Closed Nov 7, 2018

35 South Main St, Helen, GA 30545 · Masonry Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.453(b)(2)(v) · Aerial lifts
Serious$2,356$1,414Oct 22, 2018Final

Inspection 314201419 OPENED FEB 17, 2010Closed

Planned · Complete · Safety · 12 employees at the site · Closed Jun 17, 2010

137 Frontage Rd, Commerce, GA 30529 · Tile and Terrazzo Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.451(a)(6) · Scaffolds, general requirements
Serious$600$600May 4, 2010Closed
Citation 1, item 2
29 CFR 1926.451(b)(1) · Scaffolds, general requirements
Serious$750$750May 4, 2010Closed
Citation 1, item 3
29 CFR 1926.452(c)(3) · Rules for each type of scaffold
Serious$750$750May 4, 2010Closed

Inspection 13081799 OPENED MAY 20, 1976Closed

Planned · Complete · Safety · 3 employees at the site · Closed Mar 10, 1984

Daugherty Street, Athens, GA 30601 · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 13164439 OPENED MAR 2, 1976Closed

Planned · Complete · Safety · 3 employees at the site · Closed Apr 16, 1976

Us Highway 76, Hiawassee, GA 30546 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.402(a)(12) · Applicability
Other-than-serious$0$0Mar 16, 1976Closed

Inspection 13120852 OPENED JUL 25, 1973Closed

Follow-up · Complete · Safety · 6 employees at the site · Closed Mar 10, 1984

Hwy 53, Rome, GA 30161 · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 13122080 OPENED JUN 13, 1973Closed

Planned · Complete · Safety · 6 employees at the site · Closed Mar 10, 1984

Hwy 53, Rome, GA 30161 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.25 · Housekeeping
Other-than-serious$0$0Jun 29, 1973Closed

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.25 · Housekeeping

29 CFR 1926.402 · Applicability

29 CFR 1926.402(a)(12)

(a) Covered. Sections 1926.402 through 1926.408 contain installation safety requirements for electrical equipment and installations used to provide electric power and light at the jobsite. These sections apply to installations, both temporary and permanent, used on the jobsite; but these sections do not apply to existing permanent installations that were in place before the construction activity commenced.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(a)(6)

(6) Scaffolds shall be designed by a qualified person and shall be constructed and loaded in accordance with that design. Non-mandatory appendix A to this subpart contains examples of criteria that will enable an employer to comply with paragraph (a) of this section.

29 CFR 1926.451(b)(1)

(b) Scaffold platform construction. (1) Each platform on all working levels of scaffolds shall be fully planked or decked between the front uprights and the guardrail supports as follows:

29 CFR 1926.452 · Rules for each type of scaffold

29 CFR 1926.453 · Aerial lifts

Other tile and terrazzo contractors employers in Georgia

Alert subscribers get notified of each newly cited employer in Georgia the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.