OSHA SearchOSHA records by employer

Total Exteriors & Construction Inc.: OSHA inspections and violations

Layton, Utah · Finish Carpentry Contractors · NAICS 238350

2inspections
14citation items
$2,275current penalties
Aug 11, 2016last inspection

Since 2008, OSHA inspectors have visited Total Exteriors & Construction Inc. in Utah 2 times.

The most recent inspection opened on Aug 11, 2016 as a planned inspection, in Pleasant View.

In all, OSHA issued 14 citation items: 14 serious.

The proposed penalties came to $5,550; today they stand at $2,275, 59% less.

The rule cited most here is 1926.451 (scaffolds, general requirements), 10 times.

Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. Total Exteriors & Construction Inc. averages $2,025 across 1 cited inspection.

Total Exteriors & Construction Inc.: OSHA citation items per year, 2008 to 2016
Citation items per year, by inspection date.

Utah · latest 90 days of OSHA records

73employers cited

Get notified the morning OSHA posts each new citation in Utah: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Utah

Checking a subcontractor, a client or your own company? Watch Total Exteriors & Construction Inc. and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 341690881 OPENED AUG 11, 2016Closed

Planned · Partial · Safety · 6 employees at the site · Closed Feb 2, 2017

Vicinity Of 650 W And 2775 N, Pleasant View, UT 84414 · Siding Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.403(b)(1) · Electrical equipment on job sites
Serious$1,050$525Sep 14, 2016Final
Citation 1, item 1b
29 CFR 1926.403(b)(2) · Electrical equipment on job sites
Serious$0$0Sep 14, 2016Final
Citation 1, item 1c
29 CFR 1926.404(f)(6) · Ground-fault protection on job sites
Serious$0$0Sep 14, 2016Final
Citation 1, item 2a
29 CFR 1926.451(e)(1) · Scaffolds, general requirements
Serious$1,500$750Sep 14, 2016Final
Citation 1, item 2b
29 CFR 1926.451(a)(6) · Scaffolds, general requirements
Serious$0$0Sep 14, 2016Final
Citation 1, item 2c
29 CFR 1926.451(b)(2) · Scaffolds, general requirements
Serious$0$0Sep 14, 2016Final
Citation 1, item 2d
29 CFR 1926.451(c)(2) · Scaffolds, general requirements
Serious$0$0Sep 14, 2016Final
Citation 1, item 2e
29 CFR 1926.451(g)(1) · Scaffolds, general requirements
Serious$0$0Sep 14, 2016Final
Citation 1, item 2f
29 CFR 1926.452(c)(2) · Rules for each type of scaffold
Serious$0$0Sep 14, 2016Final
Citation 1, item 3
29 CFR 1926.451(f)(3) · Scaffolds, general requirements
Serious$1,500$750Sep 14, 2016Final

Inspection 310460068 OPENED MAR 25, 2008Closed

Planned · Partial · Safety · 2 employees at the site · Closed May 15, 2008

75 N. Cold Creek Way (1700 W, Layton, UT 84041 · Finish Carpentry Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.451(b)(1) · Scaffolds, general requirements
Serious$1,500$250Apr 11, 2008Closed
Citation 1, item 1b
29 CFR 1926.451(c)(2) · Scaffolds, general requirements
Serious$0$0Apr 11, 2008Closed
Citation 1, item 1c
29 CFR 1926.451(e)(1) · Scaffolds, general requirements
Serious$0$0Apr 11, 2008Closed
Citation 1, item 1d
29 CFR 1926.451(g)(1) · Scaffolds, general requirements
Serious$0$0Apr 11, 2008Closed

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.403 · Electrical equipment on job sites

29 CFR 1926.403(b)(1)

(b) Examination, installation, and use of equipment—(1) Examination. The employer shall ensure that electrical equipment is free from recognized hazards that are likely to cause death or serious physical harm to employees. Safety of equipment shall be determined on the basis of the following considerations:

29 CFR 1926.403(b)(2)

(2) Installation and use. Listed, labeled, or certified equipment shall be installed and used in accordance with instructions included in the listing, labeling, or certification.

29 CFR 1926.404 · Ground-fault protection on job sites

29 CFR 1926.404(f)(6)

(6) Grounding path. The path to ground from circuits, equipment, and enclosures shall be permanent and continuous.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.452 · Rules for each type of scaffold

Other finish carpentry contractors employers in Utah

Alert subscribers get notified of each newly cited employer in Utah the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.