OSHA SearchOSHA records by employer

Tovar's Plastering: OSHA inspections and violations

Moore, Oklahoma · Drywall and Insulation Contractors · NAICS 238310

2inspections
7citation items
$10,400current penalties
Apr 14, 2016last inspection

Tovar's Plastering has 2 OSHA inspections on record in Oklahoma, the first in 2014.

OSHA's last visit started on Apr 14, 2016 as a planned inspection, in Yukon.

Across those inspections OSHA issued 7 citation items: 7 serious.

OSHA proposed $10,400 in penalties and the amount has not been reduced.

Most often, OSHA cited 1926.451, scaffolds, general requirements (6 items).

For context, across all construction employers the median penalty per cited inspection since 2015 is $3,079. Tovar's Plastering averages $4,800 over 1 cited inspection in that time.

Tovar's Plastering: OSHA citation items per year, 2014 to 2016
Citation items per year, by inspection date.

Want to know if OSHA cites Tovar's Plastering again? Add it to a watchlist and we will email you the morning the citation shows up.

Watch this company

Inspection history

Inspection 341400844 OPENED APR 14, 2016Closed

Planned · Partial · Safety · 2 employees at the site · Closed Nov 25, 2019

1205 S. Garth Brooks Blvd., Yukon, OK 73099 · Drywall and Insulation Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.451(b)(1)(i) · Scaffolds, general requirements
Serious$1,600$1,600Jul 8, 2016Final
Citation 1, item 1b
29 CFR 1926.451(b)(8) · Scaffolds, general requirements
Serious$0$0Jul 8, 2016Final
Citation 1, item 2
29 CFR 1926.451(e)(2)(i) · Scaffolds, general requirements
Serious$1,600$1,600Jul 8, 2016Final
Citation 1, item 3a
29 CFR 1926.451(g)(1) · Scaffolds, general requirements
Serious$1,600$1,600Jul 8, 2016Final
Citation 1, item 3b
29 CFR 1926.452(c)(2) · Rules for each type of scaffold
Serious$0$0Jul 8, 2016Final

Inspection 339740607 OPENED APR 23, 2014Closed

Unprogrammed other · Partial · Safety · 4 employees at the site · Closed Oct 16, 2017

516 Sw 4th St., Moore, OK 73160 · Drywall and Insulation Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.451(b)(1) · Scaffolds, general requirements
Serious$2,800$2,800May 21, 2014Final
Citation 1, item 2
29 CFR 1926.451(f)(4) · Scaffolds, general requirements
Serious$2,800$2,800May 21, 2014Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(b)(1)

(b) Scaffold platform construction. (1) Each platform on all working levels of scaffolds shall be fully planked or decked between the front uprights and the guardrail supports as follows:

29 CFR 1926.451(b)(1)(i)

(i) Each platform unit (e.g., scaffold plank, fabricated plank, fabricated deck, or fabricated platform) shall be installed so that the space between adjacent units and the space between the platform and the uprights is no more than 1 inch (2.5 cm) wide, except where the employer can demonstrate that a wider space is necessary (for example, to fit around uprights when side brackets are used to extend the width of the platform).

29 CFR 1926.451(b)(8)

(8) At all points of a scaffold where the platform changes direction, such as turning a corner, any platform that rests on a bearer at an angle other than a right angle shall be laid first, and platforms which rest at right angles over the same bearer shall be laid second, on top of the first platform.

29 CFR 1926.452 · Rules for each type of scaffold

Other drywall and insulation contractors employers in Oklahoma

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.