Inspection 341725083 OPENED AUG 25, 2016Closed
190 Bowery Street, New York, NY 10026 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
Since 2016, OSHA inspectors have visited Tri Star Construction Group, Inc in New York 2 times.
The most recent inspection opened on Aug 25, 2016 to follow up on an earlier case, in New York.
In all, OSHA issued 3 citation items: 3 serious.
The penalties, $15,300 in total, stand where OSHA first set them.
The rule cited most here is 1926.405 (job-site wiring), 2 times.
Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. Tri Star Construction Group, Inc averages $15,300 across 1 cited inspection.
New York · latest 90 days of OSHA records
362employers cited
13 of them in the same industry
Get notified the morning OSHA posts each new citation in New York: the employer, the site address, the rules broken and the penalty.
See who gets cited nextLatest cited in New York
Checking a subcontractor, a client or your own company? Watch Tri Star Construction Group, Inc and get notified the morning OSHA posts a new citation for it.
Watch this company190 Bowery Street, New York, NY 10026 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
190 Bowery St, New York, NY 10026 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1926.403(e) · Electrical equipment on job sites |
Serious | $6,300 | $6,300 | Apr 4, 2016 | Final |
| Citation 1, item 2 29 CFR 1926.405(a)(2)(ii)(c) · Job-site wiring |
Serious | $4,500 | $4,500 | Apr 4, 2016 | Final |
| Citation 1, item 3 29 CFR 1926.405(g)(2)(iv) · Job-site wiring |
Serious | $4,500 | $4,500 | Apr 4, 2016 | Final |
Current text from the Code of Federal Regulations. Some citations were issued under older wording.
29 CFR 1926.403(e)
(e) Splices. Conductors shall be spliced or joined with splicing devices designed for the use or by brazing, welding, or soldering with a fusible metal or alloy. Soldered splices shall first be so spliced or joined as to be mechanically and electrically secure without solder and then soldered. All splices and joints and the free ends of conductors shall be covered with an insulation equivalent to that of the conductors or with an insulating device designed for the purpose.
29 CFR 1926.405(a)(2)(ii)(c)
(C) Receptacles shall be of the grounding type. Unless installed in a complete metallic raceway, each branch circuit shall contain a separate equipment grounding conductor, and all receptacles shall be electrically connected to the grounding conductor. Receptacles for uses other than temporary lighting shall not be installed on branch circuits which supply temporary lighting. Receptacles shall not be connected to the same ungrounded conductor of multiwire circuits which supply temporary lighting.
29 CFR 1926.405(g)(2)(iv)
(iv) Strain relief. Flexible cords shall be connected to devices and fittings so that strain relief is provided which will prevent pull from being directly transmitted to joints or terminal screws.
Alert subscribers get notified of each newly cited employer in New York the morning it is posted. See the alert plans.
Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.