OSHA SearchOSHA records by employer

Tri State Ironwork: OSHA inspections and violations

Passaic, New Jersey · Structural Steel and Precast Concrete Contractors · NAICS 238120

1inspections
9citation items
$16,771current penalties
Oct 17, 2019last inspection

OSHA inspectors have visited Tri State Ironwork in New Jersey one time.

It opened on Oct 17, 2019 as a planned inspection, in Passaic.

In all, OSHA issued 9 citation items: 9 serious.

The penalties, $16,771 in total, stand where OSHA first set them.

The rule cited most here is 1926.350 (gas welding and cutting), 2 times.

Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. Tri State Ironwork averages $16,771 across 1 cited inspection.

Tri State Ironwork: OSHA citation items per year, 2019 to 2019
Citation items per year, by inspection date.

New Jersey · latest 90 days of OSHA records

270employers cited

2 of them in the same industry

Get notified the morning OSHA posts each new citation in New Jersey: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in New Jersey

Checking a subcontractor, a client or your own company? Watch Tri State Ironwork and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 344593983 OPENED OCT 17, 2019Closed

Planned · Partial · Safety · 6 employees at the site · Closed Dec 6, 2023

2 Market St, Passaic, NJ 07055 · Structural Steel and Precast Concrete Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.300(b)(1) · Tools—Hand and Power: general requirements
Serious$2,892$2,892Feb 7, 2020Final
Citation 1, item 2a
29 CFR 1926.350(a)(9) · Gas welding and cutting
Serious$1,735$1,735Feb 7, 2020Final
Citation 1, item 2b
29 CFR 1926.350(a)(10) · Gas welding and cutting
Serious$0$0Feb 7, 2020Final
Citation 1, item 3
29 CFR 1926.404(b)(1)(i) · Ground-fault protection on job sites
Serious$2,313$2,313Feb 7, 2020Final
Citation 1, item 4
29 CFR 1926.405(a)(2)(ii)(e) · Job-site wiring
Serious$1,735$1,735Feb 7, 2020Final
Citation 1, item 5
29 CFR 1926.451(b)(1) · Scaffolds, general requirements
Serious$4,048$4,048Feb 7, 2020Final
Citation 1, item 6
29 CFR 1926.502(d)(6)(i) · Fall protection systems
Serious$2,313$2,313Feb 7, 2020Final
Citation 1, item 7a
29 CFR 1926.1052(a)(3) · Stairways in construction
Serious$1,735$1,735Feb 7, 2020Final
Citation 1, item 7b
29 CFR 1926.1052(c)(3)(i) · Stairways in construction
Serious$0$0Feb 7, 2020Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.1052 · Stairways in construction

29 CFR 1926.1052(a)(3)

(3) Riser height and tread depth shall be uniform within each flight of stairs, including any foundation structure used as one or more treads of the stairs. Variations in riser height or tread depth shall not be over 1/4-inch (0.6 cm) in any stairway system.

29 CFR 1926.1052(c)(3)(i)

(i) Stairrails installed after March 15, 1991, shall be not less than 36 inches (91.5 cm) from the upper surface of the stairrail system to the surface of the tread, in line with the face of the riser at the forward edge of the tread.

29 CFR 1926.300 · Tools—Hand and Power: general requirements

29 CFR 1926.300(b)(1)

(b) Guarding. (1) When power operated tools are designed to accommodate guards, they shall be equipped with such guards when in use.

29 CFR 1926.350 · Gas welding and cutting

29 CFR 1926.404 · Ground-fault protection on job sites

29 CFR 1926.405 · Job-site wiring

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.502 · Fall protection systems

Other structural steel and precast concrete contractors employers in New Jersey

Alert subscribers get notified of each newly cited employer in New Jersey the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.