OSHA SearchOSHA records by employer

Triple C Redi-Mix Inc: OSHA inspections and violations

Baker City, Oregon · Ready-Mix Concrete Manufacturing · NAICS 327320

4inspections
8citation items
$100current penalties
Jun 8, 2026last inspection

Since 1998, OSHA inspectors have visited Triple C Redi-Mix Inc in Oregon 4 times.

The most recent inspection opened on Jun 8, 2026 as a planned inspection, in Baker City.

In all, OSHA issued 8 citation items: 1 serious and 7 other-than-serious.

The penalties, $100 in total, stand where OSHA first set them.

The rule cited most here is 1910.303 (electrical equipment, general requirements), 2 times.

Among manufacturing employers, the typical cited inspection since 2015 ends with a $4,500 penalty. Triple C Redi-Mix Inc averages $0 across 1 cited inspection.

Triple C Redi-Mix Inc: OSHA citation items per year, 1998 to 2026
Citation items per year, by inspection date.

Oregon · latest 90 days of OSHA records

396employers cited

2 of them in the same industry

Get notified the morning OSHA posts each new citation in Oregon: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Oregon

Checking a subcontractor, a client or your own company? Watch Triple C Redi-Mix Inc and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 348983354 OPENED JUN 8, 2026Closed

Planned · No inspection · Safety · 4 employees at the site · Closed Jun 8, 2026

42430 Atwood Rd, Baker City, OR 97814 · Ready-Mix Concrete Manufacturing · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 341935849 OPENED NOV 16, 2016Closed

Planned · Complete · Safety · 6 employees at the site · Closed Apr 3, 2017

42430 Atwood Rd, Baker City, OR 97814 · Ready-Mix Concrete Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR OAR 437-002-0134(1)(B)
Other-than-serious$0$0Dec 7, 2016Final
Citation 1, item 2
29 CFR 1910.147(c)(4)(i) · Lockout/tagout
Other-than-serious$0$0Dec 7, 2016Final

Inspection 314519471 OPENED AUG 24, 2010Closed

Planned · Complete · Safety · 7 employees at the site · Closed Feb 18, 2011

42430 Atwood Rd, Baker City, OR 97814 · Ready-Mix Concrete Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.219(c)(4)(i) · Belts, pulleys and power-transmission parts
Serious$100$100Nov 15, 2010Closed
Citation 2, item 2
29 CFR 1910.305(j)(3)(i) · Electrical wiring methods
Other-than-serious$0$0Nov 15, 2010Closed
Citation 2, item 3 Other-than-serious$0$0Nov 15, 2010Closed
Citation 2, item 4
29 CFR 1910.303(g)(1)(ii) · Electrical equipment, general requirements
Other-than-serious$0$0Nov 15, 2010Closed
Citation 2, item 5 Other-than-serious$0$0Nov 15, 2010Closed

Inspection 124757972 OPENED APR 6, 1998Closed

Planned · Complete · Safety · 6 employees at the site · Closed Dec 17, 1999

19876 Hwy 86, Baker City, OR 97814 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.303(f) · Electrical equipment, general requirements
Other-than-serious$0$0May 5, 1998Closed

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.141 · Sanitation

29 CFR 1910.141(d)(2)(ii)

(ii) Each lavatory shall be provided with hot and cold running water, or tepid running water.

29 CFR 1910.147 · Lockout/tagout

29 CFR 1910.147(c)(4)(i)

(4) Energy control procedure. (i) Procedures shall be developed, documented and utilized for the control of potentially hazardous energy when employees are engaged in the activities covered by this section.

29 CFR 1910.219 · Belts, pulleys and power-transmission parts

29 CFR 1910.219(c)(4)(i)

(4) Projecting shaft ends. (i) Projecting shaft ends shall present a smooth edge and end and shall not project more than one-half the diameter of the shaft unless guarded by nonrotating caps or safety sleeves.

29 CFR 1910.303 · Electrical equipment, general requirements

29 CFR 1910.305 · Electrical wiring methods

29 CFR 7020.2640

Other ready-mix concrete manufacturing employers in Oregon

Alert subscribers get notified of each newly cited employer in Oregon the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.