OSHA SearchOSHA records by employer

Triple M Steel LLC: OSHA inspections and violations

Madison Heights, Michigan · Fabricated Structural Metal Manufacturing · NAICS 332312

2inspections
25citation items
$2,700current penalties
Mar 29, 2016last inspection

OSHA has inspected Triple M Steel LLC 2 times in Michigan since 2012.

The latest one began on Mar 29, 2016 as a planned inspection, in Madison Heights.

Those inspections ended with 25 citation items: 18 serious and 7 other-than-serious.

Penalties were first proposed at $3,900 and now stand at $2,700, 31% lower after settlements or reviews.

Lockout/tagout comes up most often in these citations: 3 items under 1910.147.

How that compares: the median penalty per cited inspection for manufacturing employers since 2015 is $3,600, and Triple M Steel LLC averages $1,900 (1 cited inspection).

Triple M Steel LLC: OSHA citation items per year, 2012 to 2016
Citation items per year, by inspection date.

Michigan · latest 90 days of OSHA records

643employers cited

6 of them in the same industry

Get notified the morning OSHA posts each new citation in Michigan: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Michigan

Checking a subcontractor, a client or your own company? Watch Triple M Steel LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 341356269 OPENED MAR 29, 2016Closed

Planned · Complete · Safety · 9 employees at the site · Closed Jan 31, 2018

29350 Stephenson Hwy, Madison Heights, MI 48071 · Fabricated Structural Metal Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 408.10033(4)
Serious$200$200May 12, 2016Final
Citation 1, item 2
29 CFR 408.10716
Serious$200$200May 12, 2016Final
Citation 1, item 3
29 CFR 408.10731(1)
Serious$200$200May 12, 2016Final
Citation 1, item 4
29 CFR 408.11442(2)
Serious$200$200May 12, 2016Final
Citation 1, item 5
29 CFR 408.11854(1)
Serious$200$200May 12, 2016Final
Citation 1, item 6
29 CFR 408.12154(1)
Serious$200$200May 12, 2016Final
Citation 1, item 7
29 CFR 408.12176(1)
Serious$200$200May 12, 2016Final
Citation 1, item 8
29 CFR 408.12631(1)
Serious$500$500May 12, 2016Final
Citation 2, item 1
29 CFR 408.10835(3)
Other-than-serious$0$0May 12, 2016Final
Citation 2, item 2
29 CFR 408.11872(1)(A)
Other-than-serious$0$0May 12, 2016Final
Citation 2, item 3
29 CFR 408.12163(3)
Other-than-serious$0$0May 12, 2016Final
Citation 2, item 4
29 CFR 408.13308(1)
Other-than-serious$0$0May 12, 2016Final
Citation 2, item 5
29 CFR 1910.147(c)(6)(i) · Lockout/tagout
Other-than-serious$0$0May 12, 2016Final
Citation 2, item 6
29 CFR 1910.1200(h)(3)(iv) · Hazard communication
Other-than-serious$0$0May 12, 2016Final

Inspection 315388736 OPENED AUG 28, 2012Closed

Planned · Partial · Safety · 15 employees at the site · Closed Oct 26, 2012

29350 Stephenson Hwy, Madison Heights, MI 48071 · Fabricated Structural Metal Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1 Serious$200$80Oct 2, 2012Closed
Citation 1, item 2 Serious$200$80Oct 2, 2012Closed
Citation 1, item 3 Serious$200$80Oct 2, 2012Closed
Citation 1, item 4 Serious$200$80Oct 2, 2012Closed
Citation 1, item 5 Serious$250$100Oct 2, 2012Closed
Citation 1, item 6 Serious$250$100Oct 2, 2012Closed
Citation 1, item 7 Serious$200$80Oct 2, 2012Closed
Citation 1, item 8
29 CFR 1910.303(g)(2)(i) · Electrical equipment, general requirements
Serious$250$100Oct 2, 2012Closed
Citation 1, item 9a
29 CFR 1910.147(c)(4)(i) · Lockout/tagout
Serious$250$100Oct 2, 2012Closed
Citation 1, item 9b
29 CFR 1910.147(c)(7)(ia) · Lockout/tagout
Serious$0$0Oct 2, 2012Closed
Citation 2, item 1 Other-than-serious$0$0Oct 2, 2012Closed

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.1200 · Hazard communication

29 CFR 1910.1200(h)(3)(iv)

(iv) The details of the hazard communication program developed by the employer, including an explanation of the labels received on shipped containers and the workplace labeling system used by their employer; the safety data sheet, including the order of information and how employees can obtain and use the appropriate hazard information.

29 CFR 1910.147 · Lockout/tagout

29 CFR 1910.147(c)(4)(i)

(4) Energy control procedure. (i) Procedures shall be developed, documented and utilized for the control of potentially hazardous energy when employees are engaged in the activities covered by this section.

29 CFR 1910.147(c)(6)(i)

(6) Periodic inspection. (i) The employer shall conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirements of this standard are being followed.

29 CFR 1910.303 · Electrical equipment, general requirements

29 CFR 4081.1442

29 CFR 4081.220

29 CFR 4081.2611

29 CFR 4081.2631

29 CFR 4081.2637

29 CFR 4081.716

29 CFR 4081.731

29 CFR 4082.2129

Other fabricated structural metal manufacturing employers in Michigan

Alert subscribers get notified of each newly cited employer in Michigan the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.