OSHA SearchOSHA records by employer

Troy Barnard: OSHA inspections and violations

Thomasville, Georgia · Drywall and Insulation Contractors · NAICS 238310

1inspections
7citation items
$2,608current penalties
Jun 28, 2017last inspection

OSHA has inspected Troy Barnard once in Georgia.

The inspection began on Jun 28, 2017 as a planned inspection, in Thomasville.

That inspection ended with 7 citation items: 7 serious.

Penalties were first proposed at $7,606 and now stand at $2,608, 66% lower after settlements or reviews.

Scaffolds, general requirements comes up most often in these citations: 5 items under 1926.451.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and Troy Barnard averages $2,608 (1 cited inspection).

Troy Barnard: OSHA citation items per year, 2017 to 2017
Citation items per year, by inspection date.

Georgia · latest 90 days of OSHA records

136employers cited

Get notified the morning OSHA posts each new citation in Georgia: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Georgia

Checking a subcontractor, a client or your own company? Watch Troy Barnard and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 342442662 OPENED JUN 28, 2017Closed

Planned · Partial · Safety · 2 employees at the site · Closed May 24, 2018

396 Liberty Street, Thomasville, GA 31757 · Drywall and Insulation Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.451(b)(1) · Scaffolds, general requirements
Serious$3,803$1,304Aug 10, 2017Final
Citation 1, item 1b
29 CFR 1926.451(c)(2) · Scaffolds, general requirements
Serious$0$0Aug 10, 2017Final
Citation 1, item 1c
29 CFR 1926.451(f)(7) · Scaffolds, general requirements
Serious$0$0Aug 10, 2017Final
Citation 1, item 1d
29 CFR 1926.454(b) · Scaffold training
Serious$0$0Aug 10, 2017Final
Citation 1, item 2a
29 CFR 1926.451(e)(1) · Scaffolds, general requirements
Serious$3,803$1,304Aug 10, 2017Final
Citation 1, item 2b
29 CFR 1926.451(g)(1) · Scaffolds, general requirements
Serious$0$0Aug 10, 2017Final
Citation 1, item 2c
29 CFR 1926.454(a) · Scaffold training
Serious$0$0Aug 10, 2017Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(b)(1)

(b) Scaffold platform construction. (1) Each platform on all working levels of scaffolds shall be fully planked or decked between the front uprights and the guardrail supports as follows:

29 CFR 1926.451(c)(2)

(2) Supported scaffold poles, legs, posts, frames, and uprights shall bear on base plates and mud sills or other adequate firm foundation.

29 CFR 1926.451(e)(1)

(1) When scaffold platforms are more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from another scaffold, structure, personnel hoist, or similar surface shall be used. Crossbraces shall not be used as a means of access.

29 CFR 1926.454 · Scaffold training

Other drywall and insulation contractors employers in Georgia

Alert subscribers get notified of each newly cited employer in Georgia the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.