OSHA SearchOSHA records by employer

Veloz Construction LLC: OSHA inspections and violations

Littleton, Colorado · New Single-Family Housing Construction (except For-Sale Builders) · NAICS 236115

2inspections
2citation items
$2,611current penalties
Feb 10, 2022last inspection

OSHA has inspected Veloz Construction LLC 2 times in Colorado since 2015.

The latest one began on Feb 10, 2022 as a planned inspection, in Henderson.

Those inspections ended with 2 citation items: 2 serious.

Penalties were first proposed at $4,351 and now stand at $2,611, 40% lower after settlements or reviews.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and Veloz Construction LLC averages $2,611 (1 cited inspection).

Veloz Construction LLC: OSHA citation items per year, 2015 to 2022
Citation items per year, by inspection date.

Colorado · latest 90 days of OSHA records

131employers cited

3 of them in the same industry

Get notified the morning OSHA posts each new citation in Colorado: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Colorado

Checking a subcontractor, a client or your own company? Watch Veloz Construction LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 345780019 OPENED FEB 10, 2022Closed

Planned · Partial · Safety · 8 employees at the site · Closed Apr 25, 2022

891 Tarragon Road, Henderson, CO 80640 · Siding Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.451(g)(4)(i) · Scaffolds, general requirements
Serious$4,351$2,611Mar 10, 2022Final
Citation 1, item 1b
29 CFR 1926.452(j)(2) · Rules for each type of scaffold
Serious$0$0Mar 10, 2022Final

Inspection 340645209 OPENED MAY 20, 2015Closed

Complaint · No inspection · Safety · 7 employees at the site · Closed May 21, 2015

24 Club Lane, Littleton, CO 80123 · New Single-Family Housing Construction (except For-Sale Builders) · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(g)(4)(i)

(i) Guardrail systems shall be installed along all open sides and ends of platforms. Guardrail systems shall be installed before the scaffold is released for use by employees other than erection/dismantling crews.

29 CFR 1926.452 · Rules for each type of scaffold

29 CFR 1926.452(j)(2)

(2) Poles shall be secured to the structure by rigid triangular bracing or equivalent at the bottom, top, and other points as necessary. When the pump jack has to pass bracing already installed, an additional brace shall be installed approximately 4 feet (1.2 m) above the brace to be passed, and shall be left in place until the pump jack has been moved and the original brace reinstalled.

Other new single-family housing construction (except for-sale builders) employers in Colorado

Alert subscribers get notified of each newly cited employer in Colorado the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.