VRJ Remodeling, LLC.: OSHA inspections and violations

Jacksonville, Florida · Siding Contractors · NAICS 238170

1inspections
6citation items
$5,209current penalties
Jul 1, 2026last inspection

OSHA inspectors have visited VRJ Remodeling, LLC. in Florida one time.

It opened on Jul 1, 2026 as a planned inspection, in Jacksonville.

In all, OSHA issued 6 citation items: 6 serious.

The proposed penalties came to $8,682; today they stand at $5,209, 40% less.

The rule cited most here is 1926.451 (scaffolds, general requirements), 6 times.

Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. VRJ Remodeling, LLC. averages $5,209 across 1 cited inspection.

VRJ Remodeling, LLC.: OSHA citation items per year, 2026 to 2026
Citation items per year, by inspection date.

Florida · latest 90 days of OSHA records

333employers cited

3 of them in the same industry

Get notified the morning OSHA posts each new citation in Florida: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Florida

Checking a subcontractor, a client or your own company? Watch VRJ Remodeling, LLC. and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 349027714 OPENED JUL 1, 2026Closed

Planned · Complete · Safety · 5 employees at the site · Closed Aug 26, 2026

1141 Kendall Town Boulevard Building 6e, Jacksonville, FL 32216 · Siding Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.451(b)(1) · Scaffolds, general requirements
Serious$2,894$1,736Jul 9, 2026Final
Citation 1, item 1b
29 CFR 1926.451(b)(4) · Scaffolds, general requirements
Serious$0$0Jul 9, 2026Final
Citation 1, item 2
29 CFR 1926.451(e)(1) · Scaffolds, general requirements
Serious$2,894$1,736Jul 9, 2026Final
Citation 1, item 3a
29 CFR 1926.451(g)(4)(i) · Scaffolds, general requirements
Serious$2,894$1,736Jul 9, 2026Final
Citation 1, item 3b
29 CFR 1926.451(g)(4)(iv) · Scaffolds, general requirements
Serious$0$0Jul 9, 2026Final
Citation 1, item 3c
29 CFR 1926.451(f)(3) · Scaffolds, general requirements
Serious$0$0Jul 9, 2026Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(b)(1)

(b) Scaffold platform construction. (1) Each platform on all working levels of scaffolds shall be fully planked or decked between the front uprights and the guardrail supports as follows:

29 CFR 1926.451(b)(4)

(4) Each end of a platform, unless cleated or otherwise restrained by hooks or equivalent means, shall extend over the centerline of its support at least 6 inches (15 cm).

29 CFR 1926.451(e)(1)

(1) When scaffold platforms are more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from another scaffold, structure, personnel hoist, or similar surface shall be used. Crossbraces shall not be used as a means of access.

Other siding contractors employers in Florida

Alert subscribers get notified of each newly cited employer in Florida the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.