OSHA SearchOSHA records by employer

War Construction, Inc.: OSHA inspections and violations

Fulton, Mississippi · Commercial and Institutional Building Construction · NAICS 236220

1inspections
2citation items
$6,500current penalties
May 11, 2021last inspection

OSHA has inspected War Construction, Inc. once in Mississippi.

The inspection began on May 11, 2021 as a planned inspection, in Fulton.

That inspection ended with 2 citation items: 2 other-than-serious.

Penalties were first proposed at $8,582 and now stand at $6,500, 24% lower after settlements or reviews.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,079, and War Construction, Inc. averages $6,500 (1 cited inspection).

War Construction, Inc.: OSHA citation items per year, 2021 to 2021
Citation items per year, by inspection date.

Want to know if OSHA cites War Construction, Inc. again? Add it to a watchlist and we will email you the morning the citation shows up.

Watch this company

Inspection history

Inspection 345308035 OPENED MAY 11, 2021Closed

Planned · Complete · Safety · 4 employees at the site · Closed Mar 28, 2023

611 West Main Street, Fulton, MS 38843 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.304(g)(1) · Woodworking tools
Other-than-serious$4,681$4,681Jul 28, 2021Final
Citation 1, item 2
29 CFR 1926.1412(f)(1) · Inspections
Other-than-serious$3,901$1,819Jul 28, 2021Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.1412 · Inspections

29 CFR 1926.1412(f)(1)

(f) Annual/comprehensive. (1) At least every 12 months the equipment must be inspected by a qualified person in accordance with paragraph (d) of this section (each shift) except that the corrective action set forth in paragraphs (f)(4), (f)(5), and (f)(6) of this section must apply in place of the corrective action required by paragraphs (d)(2) and (d)(3) of this section.

29 CFR 1926.304 · Woodworking tools

29 CFR 1926.304(g)(1)

(g) Radial saws. (1) The upper hood shall completely enclose the upper portion of the blade down to a point that will include the end of the saw arbor. The upper hood shall be constructed in such a manner and of such material that it will protect the operator from flying splinters, broken saw teeth, etc., and will deflect sawdust away from the operator. The sides of the lower exposed portion of the blade shall be guarded to the full diameter of the blade by a device that will automatically adjust itself to the thickness of the stock and remain in contact with stock being cut to give maximum protection possible for the operation being performed.

Other commercial and institutional building construction employers in Mississippi

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.