OSHA SearchOSHA records by employer

Washington Electric Cooperative, Inc.: OSHA inspections and violations

Lower Salem, Ohio · Other Electric Power Generation · NAICS 221118

1inspections
4citation items
$13,108current penalties
Apr 2, 2020last inspection

OSHA has inspected Washington Electric Cooperative, Inc. once in Ohio.

The inspection began on Apr 2, 2020 on a referral, in Lower Salem.

That inspection ended with 4 citation items: 4 serious.

Penalties were first proposed at $13,108 and still stand at $13,108.

Electric power generation, transmission, and distribution comes up most often in these citations: 4 items under 1910.269.

How that compares: the median penalty per cited inspection for utility employers since 2015 is $0, and Washington Electric Cooperative, Inc. averages $13,108 (1 cited inspection).

It reported 1 severe injury to OSHA since 2015.

Washington Electric Cooperative, Inc.: OSHA citation items per year, 2020 to 2020
Citation items per year, by inspection date.

Ohio · latest 90 days of OSHA records

251employers cited

Get notified the morning OSHA posts each new citation in Ohio: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Ohio

Checking a subcontractor, a client or your own company? Watch Washington Electric Cooperative, Inc. and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 344717046 OPENED APR 2, 2020Closed

Referral · Partial · Safety · 24 employees at the site · Closed Jun 18, 2020

36200 Paw Paw Rd, Lower Salem, OH 45745 · Other Electric Power Generation · OSHA's record · Phone and website on Google Maps

Incident on Mar 31, 2020: Employee sustains electrical shock and burns when climbing p

At 11:00 a.m. on March 31, 2020, an employee working as an electrical lineman for an electrical power distributor was climbing a utility pole to begin work on an insulator. As the employee climbed the pole and approached the line, he contacted the 7,200-volt line. The employee was shocked when the electricity entered his right hand and exited out his back. The employee was hospitalized to treat electrical shock and electrical burns.

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.269(c)(1)(ii) · Electric power generation, transmission, and distribution
Serious$3,277$3,277Apr 30, 2020Final
Citation 1, item 2
29 CFR 1910.269(m)(3)(ii) · Electric power generation, transmission, and distribution
Serious$3,277$3,277Apr 30, 2020Final
Citation 1, item 3
29 CFR 1910.269(n)(2) · Electric power generation, transmission, and distribution
Serious$3,277$3,277Apr 30, 2020Final
Citation 1, item 4
29 CFR 1910.269(n)(5) · Electric power generation, transmission, and distribution
Serious$3,277$3,277Apr 30, 2020Final

Severe injury reports

Employers must report any work-related amputation, in-patient hospitalization or loss of an eye to OSHA within 24 hours. 1 report on file.

Mar 31, 2020, Lower Salem: Hospitalization · electrocutions, electric shocks · body systems

While replacing electric insulators, a lineman came into contact with an energized line. The current entered the lineman's hand and exited through his back.

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.269 · Electric power generation, transmission, and distribution

29 CFR 1910.269(c)(1)(ii)

(ii) The employer shall ensure that the employee in charge conducts a job briefing that meets paragraphs (c)(2), (c)(3), and (c)(4) of this section with the employees involved before they start each job.

29 CFR 1910.269(m)(3)(ii)

(ii) The employer shall ensure that all switches, disconnectors, jumpers, taps, and other means through which known sources of electric energy may be supplied to the particular lines and equipment to be deenergized are open. The employer shall render such means inoperable, unless its design does not so permit, and then ensure that such means are tagged to indicate that employees are at work.

29 CFR 1910.269(n)(2)

(2) General. For any employee to work transmission and distribution lines or equipment as deenergized, the employer shall ensure that the lines or equipment are deenergized under the provisions of paragraph (m) of this section and shall ensure proper grounding of the lines or equipment as specified in paragraphs (n)(3) through (n)(8) of this section. However, if the employer can demonstrate that installation of a ground is impracticable or that the conditions resulting from the installation of a ground would present greater hazards to employees than working without grounds, the lines and equipment may be treated as deenergized provided that the employer establishes that all of the following conditions apply:

Other other electric power generation employers in Ohio

Alert subscribers get notified of each newly cited employer in Ohio the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.