OSHA SearchOSHA records by employer

Waterbourne Construction Advisors, LLC: OSHA inspections and violations

Cheektowaga, New York · Commercial and Institutional Building Construction · NAICS 236220

6inspections
3citation items
$200current penalties
Jan 17, 2025last inspection

OSHA has inspected Waterbourne Construction Advisors, LLC 6 times in New York since 2008.

The latest one began on Jan 17, 2025 as a planned inspection, in Niagara Falls.

Those inspections ended with 3 citation items: 2 serious and 1 other-than-serious.

Penalties were first proposed at $3,409 and now stand at $200, 94% lower after settlements or reviews.

Job-site wiring comes up most often in these citations: 3 items under 1926.405.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and Waterbourne Construction Advisors, LLC averages $0 (1 cited inspection).

Waterbourne Construction Advisors, LLC: OSHA citation items per year, 2008 to 2025
Citation items per year, by inspection date.

New York · latest 90 days of OSHA records

361employers cited

13 of them in the same industry

Get notified the morning OSHA posts each new citation in New York: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in New York

Checking a subcontractor, a client or your own company? Watch Waterbourne Construction Advisors, LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 347994253 OPENED JAN 17, 2025Closed

Planned · Partial · Safety · 2 employees at the site · Closed Jan 17, 2025

56 Acheson Drive, Niagara Falls, NY 14303 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 345197206 OPENED MAR 12, 2021Closed

Planned · Complete · Safety · 1 employee at the site · Closed Jan 20, 2022

42 N Ellicott Creek Road, Amherst, NY 14228 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.405(a)(2)(ii)(i) · Job-site wiring
Serious$2,959$0Apr 26, 2021Final
Citation 2, item 1
29 CFR 1926.405(a)(2)(ii)(c) · Job-site wiring
Other-than-serious$0$0Apr 26, 2021Final

Inspection 339640807 OPENED MAR 20, 2014Closed

Complaint · Partial · Health · 4 employees at the site · Closed Apr 18, 2014

4635 Union Road, Cheektowaga, NY 14225 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 339159907 OPENED JUL 2, 2013Closed

Planned · Complete · Safety · 1 employee at the site · Closed Jul 2, 2013

199 Park Club Lane, Williamsville, NY 14221 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 312226947 OPENED MAY 29, 2008Closed

Planned · Complete · Safety · 1 employee at the site · Closed May 29, 2008

51 Robinson Street, North Tonawanda, NY 14120 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 311688394 OPENED JAN 16, 2008Closed

Planned · Complete · Safety · 1 employee at the site · Closed Feb 29, 2008

7 Community Drive, Cheektowaga, NY 14225 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.405(j)(1)(ii) · Job-site wiring
Serious$450$200Feb 6, 2008Closed

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.405 · Job-site wiring

29 CFR 1926.405(a)(2)(ii)(c)

(C) Receptacles shall be of the grounding type. Unless installed in a complete metallic raceway, each branch circuit shall contain a separate equipment grounding conductor, and all receptacles shall be electrically connected to the grounding conductor. Receptacles for uses other than temporary lighting shall not be installed on branch circuits which supply temporary lighting. Receptacles shall not be connected to the same ungrounded conductor of multiwire circuits which supply temporary lighting.

29 CFR 1926.405(a)(2)(ii)(i)

(iii) Guarding. For temporary wiring over 600 volts, nominal, fencing, barriers, or other effective means shall be provided to prevent access of other than authorized and qualified personnel.

29 CFR 1926.405(j)(1)(ii)

(ii) Support. Fixtures, lampholders, rosettes, and receptacles shall be securely supported. A fixture that weighs more than 6 pounds (2.72 kg) or exceeds 16 inches (406 mm) in any dimension shall not be supported by the screw shell of a lampholder.

Other commercial and institutional building construction employers in New York

Alert subscribers get notified of each newly cited employer in New York the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.