OSHA SearchOSHA records by employer

WD Design Build LLC: OSHA inspections and violations

Brooklyn, New York · Poured Concrete Foundation and Structure Contractors · NAICS 238110

2inspections
3citation items
$11,752current penalties
Aug 11, 2026last inspection

WD Design Build LLC has 2 OSHA inspections on record in New York, the first in 2024.

OSHA's last visit started on Aug 11, 2026 to follow up on an earlier case, in Brooklyn, and the case has not closed yet.

Across those inspections OSHA issued 3 citation items: 3 serious.

OSHA proposed $11,752 in penalties and the amount has not been reduced.

Most often, OSHA cited 1926.403, electrical equipment on job sites (2 items).

For context, across all construction employers the median penalty per cited inspection since 2015 is $3,080. WD Design Build LLC averages $11,752 over 1 cited inspection in that time.

WD Design Build LLC: OSHA citation items per year, 2024 to 2026
Citation items per year, by inspection date.

New York · latest 90 days of OSHA records

353employers cited

5 of them in the same industry

Get notified the morning OSHA posts each new citation in New York: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in New York

Checking a subcontractor, a client or your own company? Watch WD Design Build LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 349113159 OPENED AUG 11, 2026Open

Follow-up · Partial · Safety · 4 employees at the site · Open

580 Park Place, Brooklyn, NY 11238 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection so far.

Inspection 347504839 OPENED MAY 23, 2024Open

Planned · Partial · Safety · 4 employees at the site · Open

580 Park Place, Brooklyn, NY 11238 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.403(b)(2) · Electrical equipment on job sites
Serious$2,765$2,765Nov 18, 2024Final
Citation 1, item 2
29 CFR 1926.403(i)(2)(i) · Electrical equipment on job sites
Serious$4,839$4,839Nov 18, 2024Final
Citation 1, item 3
29 CFR 1926.405(b)(2) · Job-site wiring
Serious$4,148$4,148Nov 18, 2024Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.403 · Electrical equipment on job sites

29 CFR 1926.403(b)(2)

(2) Installation and use. Listed, labeled, or certified equipment shall be installed and used in accordance with instructions included in the listing, labeling, or certification.

29 CFR 1926.403(i)(2)(i)

(2) Guarding of live parts. (i) Except as required or permitted elsewhere in this subpart, live parts of electric equipment operating at 50 volts or more shall be guarded against accidental contact by cabinets or other forms of enclosures, or by any of the following means:

29 CFR 1926.405 · Job-site wiring

29 CFR 1926.405(b)(2)

(2) Covers and canopies. All pull boxes, junction boxes, and fittings shall be provided with covers. If metal covers are used, they shall be grounded. In energized installations each outlet box shall have a cover, faceplate, or fixture canopy. Covers of outlet boxes having holes through which flexible cord pendants pass shall be provided with bushings designed for the purpose or shall have smooth, well-rounded surfaces on which the cords may bear.

Other poured concrete foundation and structure contractors employers in New York

Alert subscribers get notified of each newly cited employer in New York the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.