OSHA SearchOSHA records by employer

Webcor Packaging: OSHA inspections and violations

Burton, Michigan · Corrugated and Solid Fiber Box Manufacturing · NAICS 322211

12inspections
46citation items
$33,578current penalties
Sep 8, 2025last inspection

Webcor Packaging has 12 OSHA inspections on record in Michigan, the first in 1989.

OSHA's last visit started on Sep 8, 2025 on a referral, in Burton.

Across those inspections OSHA issued 46 citation items: 20 serious, 4 repeat and 22 other-than-serious.

OSHA proposed $61,815 in penalties. After settlements and reviews the total is $33,578, down 46%.

Most often, OSHA cited 1910.147, lockout/tagout (5 items).

For context, across all manufacturing employers the median penalty per cited inspection since 2015 is $4,500. Webcor Packaging averages $6,475 over 4 cited inspections in that time.

Webcor Packaging: OSHA citation items per year, 1989 to 2025
Citation items per year, by inspection date.

Want to know if OSHA cites Webcor Packaging again? Add it to a watchlist and we will email you the morning the citation shows up.

Watch this company

Inspection history

Inspection 348488693 OPENED SEP 8, 2025Closed

Referral · Partial · Safety · 87 employees at the site · Closed Dec 3, 2025

1220 North Center Road, Burton, MI 48509 · Paper Bag and Coated and Treated Paper Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1910.147(c)(4)(i) · Lockout/tagout
Serious$5,600$2,800Nov 5, 2025Final
Citation 1, item 1b
29 CFR 1910.147(c)(7)(i)(a) · Lockout/tagout
Serious$0$0Nov 5, 2025Final
Citation 1, item 1c
29 CFR 1910.147(c)(6)(i) · Lockout/tagout
Serious$0$0Nov 5, 2025Final
Citation 2, item 1
29 CFR 1910.28(b)(3)(ii) · Fall protection in general industry
Other-than-serious$700$350Nov 5, 2025Final
Citation 3, item 1
29 CFR 408.22141(2)
Other-than-serious$800$400Nov 5, 2025Final

Inspection 345716393 OPENED JAN 10, 2022Closed

Planned · Complete · Safety · 128 employees at the site · Closed Mar 1, 2022

8789 East Lansing Rd., Durand, MI 48429 · Corrugated and Solid Fiber Box Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.305(b)(1)(ii) · Electrical wiring methods
Serious$3,000$1,500Feb 4, 2022Final
Citation 2, item 1
29 CFR 408.10125
Other-than-serious$0$0Feb 4, 2022Final
Citation 2, item 2
29 CFR 1910.303(g)(1) · Electrical equipment, general requirements
Other-than-serious$0$0Feb 4, 2022Final
Citation 2, item 3
29 CFR 408.15815(2)
Other-than-serious$0$0Feb 4, 2022Final

Inspection 342892627 OPENED JAN 24, 2018Closed

Referral · Partial · Safety · 130 employees at the site · Closed Jun 4, 2018

8789 East Lansing Rd., Durand, MI 48429 · Corrugated and Solid Fiber Box Manufacturing · OSHA's record · Phone and website on Google Maps

Incident on Dec 20, 2017: Employee injures fingers when hand is caught in machine's be

At 10:00 a.m. on December 20, 2017, an employee was performing maintenance on a Jag Tapper to repair its clutching mechanism. During work, the employee's right hand became caught between the machine's belt and pulley. The employee's pinky finger was amputated and three others crushed, which he was hospitalized and received treatment.

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 408.10727(1)
Serious$3,500$1,750Mar 13, 2018Final
Citation 1, item 2
29 CFR 408.10736
Serious$3,500$1,750Mar 13, 2018Final
Citation 1, item 3
29 CFR 408.16311(A)
Serious$3,500$1,750Mar 13, 2018Final
Citation 2, item 1
29 CFR 408.16323(4)
Repeat$11,200$5,600Mar 13, 2018Final
Citation 2, item 2
29 CFR 408.16374(4)
Repeat$8,000$4,000Mar 13, 2018Final

Inspection 341933505 OPENED DEC 1, 2016Closed

Referral · Partial · Safety · 140 employees at the site · Closed Feb 17, 2017

1220 N Center Rd, Burton, MI 48509 · Corrugated and Solid Fiber Box Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1910.147(c)(4)(i) · Lockout/tagout
Serious$7,000$3,500Jan 19, 2017Final
Citation 1, item 1b
29 CFR 1910.147(c)(7)(i)(a) · Lockout/tagout
Serious$0$0Jan 19, 2017Final
Citation 2, item 1
29 CFR 408.22139(1)
Other-than-serious$5,000$2,500Jan 19, 2017Final

Inspection 312050644 OPENED MAY 13, 2014Closed

Planned · Partial · Safety · 140 employees at the site · Closed Nov 18, 2014

1220 N Center Rd, Burton, MI 48509 · Corrugated and Solid Fiber Box Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1 Serious$3,500$3,500Aug 20, 2014Closed

Inspection 311997068 OPENED FEB 16, 2012Closed

Complaint · Partial · Safety · 95 employees at the site · Closed May 15, 2012

1220 N Center Rd, Burton, MI 48509 · Corrugated and Solid Fiber Box Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1 Serious$1,250$625Apr 9, 2012Closed

Inspection 307747840 OPENED FEB 28, 2008Closed

Planned · Records only · Safety · 9 employees at the site · Closed Mar 14, 2008

5081 Exchange Dr, Flint, MI 48507 · Corrugated and Solid Fiber Box Manufacturing · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 127186476 OPENED JUL 15, 1999Closed

Planned · Complete · Safety · 46 employees at the site · Closed Nov 9, 1999

1220 N Center, Burton, MI 48509 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1 Serious$525$262Oct 14, 1999Closed
Citation 1, item 2 Serious$525$262Oct 14, 1999Closed
Citation 1, item 3 Serious$525$262Oct 14, 1999Closed
Citation 1, item 4 Serious$525$262Oct 14, 1999Closed
Citation 1, item 5
29 CFR 1910.303(g)(2)(i) · Electrical equipment, general requirements
Serious$525$262Oct 14, 1999Closed
Citation 2, item 1 Other-than-serious$0$0Oct 14, 1999Closed
Citation 2, item 2 Other-than-serious$0$0Oct 14, 1999Closed
Citation 2, item 3
29 CFR 1910.305(b)(1) · Electrical wiring methods
Other-than-serious$0$0Oct 14, 1999Closed
Citation 2, item 4
29 CFR 1910.305(g)(1)(i) · Electrical wiring methods
Other-than-serious$0$0Oct 14, 1999Closed
Citation 2, item 5
29 CFR 1910.305(g)(2)(iii) · Electrical wiring methods
Other-than-serious$0$0Oct 14, 1999Closed
4 older inspections

Inspection 110823374 OPENED AUG 13, 1991Closed

Follow-up · Partial · Safety · 40 employees at the site · Closed Aug 26, 1991

1220 N. Center, Burton, MI 48509 · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 110822566 OPENED DEC 17, 1990Closed

Planned · Complete · Safety · 42 employees at the site · Closed Apr 17, 1991

1220 N. Center, Burton, MI 48509 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1 Serious$320$320Jan 31, 1991Closed
Citation 1, item 2 Serious$320$320Jan 31, 1991Closed
Citation 1, item 3 Serious$240$240Jan 31, 1991Closed
Citation 2, item 1 Serious$800$400Jan 31, 1991Closed
Citation 3, item 1 Other-than-serious$0$0Jan 31, 1991Closed
Citation 3, item 2 Other-than-serious$0$0Jan 31, 1991Closed
Citation 3, item 3 Other-than-serious$0$0Jan 31, 1991Closed
Citation 3, item 4 Other-than-serious$0$0Jan 31, 1991Closed
Citation 3, item 5 Other-than-serious$0$0Jan 31, 1991Closed
Citation 3, item 6 Other-than-serious$0$0Jan 31, 1991Closed
Citation 3, item 7 Other-than-serious$0$0Jan 31, 1991Closed
Citation 3, item 8 Other-than-serious$0$0Jan 31, 1991Closed
Citation 3, item 9
29 CFR 1910.1200(f)(4) · Hazard communication
Other-than-serious$0$0Jan 31, 1991Closed

Inspection 110698370 OPENED NOV 15, 1989Closed

Planned · Partial · Safety · 30 employees at the site · Closed Jan 18, 1990

1220 N. Center, Burton, MI 48509 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1 Other-than-serious$0$0Jan 4, 1990Closed
Citation 1, item 2 Other-than-serious$0$0Jan 4, 1990Closed

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.1200 · Hazard communication

29 CFR 1910.1200(f)(4)

(f) Any organic peroxide which, in laboratory testing, neither detonates in the cavitated state nor deflagrates at all and shows only a low or no effect when heated under confinement as well as low or no explosive power shall be defined as organic peroxide TYPE F;

29 CFR 1910.147 · Lockout/tagout

29 CFR 1910.147(c)(4)(i)

(4) Energy control procedure. (i) Procedures shall be developed, documented and utilized for the control of potentially hazardous energy when employees are engaged in the activities covered by this section.

29 CFR 1910.147(c)(6)(i)

(6) Periodic inspection. (i) The employer shall conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirements of this standard are being followed.

29 CFR 1910.28 · Fall protection in general industry

29 CFR 1910.303 · Electrical equipment, general requirements

29 CFR 1910.305 · Electrical wiring methods

29 CFR 1910.309

29 CFR 3090.110

29 CFR 3090.250

29 CFR 4081.11

29 CFR 4081.114

29 CFR 4081.123

29 CFR 4081.1442

29 CFR 4081.15

29 CFR 4081.1872

29 CFR 4081.2185

29 CFR 4081.2635

29 CFR 4081.34

29 CFR 4081.36

29 CFR 4081.6311

29 CFR 4081.6332

29 CFR 4081.6374

29 CFR 4081.716

29 CFR 4081.722

29 CFR 4081.727

29 CFR 4081.731

29 CFR 4081.835

Other corrugated and solid fiber box manufacturing employers in Michigan

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.