OSHA SearchOSHA records by employer

Wellons Construction, Inc.: OSHA inspections and violations

Raleigh, North Carolina · Site Preparation Contractors · NAICS 238910

21inspections
42citation items
$47,044current penalties
Sep 26, 2025last inspection

Since 1994, OSHA inspectors have visited Wellons Construction, Inc. in North Carolina 21 times.

The most recent inspection opened on Sep 26, 2025 after a complaint, in Raleigh.

In all, OSHA issued 42 citation items: 38 serious, 1 repeat and 3 other-than-serious.

The proposed penalties came to $51,520; today they stand at $47,044, 9% less.

The rule cited most here is 1926.651 (excavations), 15 times.

Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. Wellons Construction, Inc. averages $11,898 across 3 cited inspections.

1 inspection on this page followed a fatal incident.

Wellons Construction, Inc. also files yearly injury logs with OSHA, summarized below.

Wellons Construction, Inc.: OSHA citation items per year, 1994 to 2025
Citation items per year, by inspection date.

Want to know if OSHA cites Wellons Construction, Inc. again? Add it to a watchlist and we will email you the morning the citation shows up.

Watch this company

Inspection history

Inspection 348531765 OPENED SEP 26, 2025Closed

Complaint · Partial · Safety · 230 employees at the site · Closed Nov 12, 2025

4215 Whitfield Road, Raleigh, NC 27610 · Water and Sewer Line and Related Structures Construction · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 348070194 OPENED FEB 26, 2025Closed

Complaint · Partial · Safety · 25 employees at the site · Closed Mar 31, 2025

4212 Wimberly Road, Willow Spring, NC 27592 · Water and Sewer Line and Related Structures Construction · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 347642308 OPENED JUL 23, 2024Closed

Fatality or catastrophe · Partial · Safety · 15 employees at the site · Closed Mar 12, 2025

Located In The Area Of 610 Harnett Central Road, Lillington, NC 27546 · Site Preparation Contractors · OSHA's record · Phone and website on Google Maps

Incident on Jul 23, 2024 (fatal): Employee dies of blunt trauma crushed when compactor rolls

At 3:49 p.m. on July 23, 2024, an employee working for a site preparation contractor was operating a CAT Sheep Foot Compactor Roller. The employee was compacting soil over a previously installed 18-foot RCP as part of a storm water drainage system located in a future residential sub-division. While compacting the soil and driving in reverse, the employee navigated over an approximately 2-foot-high dirt berm left by the excavator that back filled the trench. While driving over the berm, it appears the employee turned the compactor sharply causing the compactor to overturn. The employee was either ejected or tried to jump as the compactor started to roll. The employee was pinned between the ROPS and the ground. The employee had not been wearing the functioning seat beat in the cab of the compactor. The employee died from multiple blunt force trauma.

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 95.129(01)
Serious$11,291$9,597Jan 22, 2025Final
Citation 1, item 2
29 CFR 1926.21(b)(2) · Construction safety training
Serious$11,291$9,597Jan 22, 2025Final

Inspection 346084619 OPENED JUL 15, 2022Closed

Complaint · Partial · Safety · 7 employees at the site · Closed Sep 14, 2022

544 E Hargett St., Raleigh, NC 27601 · Site Preparation Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 345754451 OPENED JAN 31, 2022Closed

Planned · Complete · Safety · 4 employees at the site · Closed Apr 22, 2022

Vicinity 1525 Averette Road, Wake Forest, NC 27587 · Water and Sewer Line and Related Structures Construction · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.651(c)(2) · Excavations
Serious$2,250$2,250Apr 1, 2022Final
Citation 1, item 2
29 CFR 1926.651(j)(2) · Excavations
Serious$1,350$1,350Apr 1, 2022Final
Citation 1, item 3
29 CFR 1926.651(k)(1) · Excavations
Serious$2,250$2,250Apr 1, 2022Final
Citation 1, item 4
29 CFR 1926.652(a)(1) · Trench protection
Serious$2,250$2,250Apr 1, 2022Final

Inspection 342296779 OPENED APR 28, 2017Closed

Planned · Complete · Safety · 6 employees at the site · Closed Aug 16, 2017

5742 Moon Seed Lane, Whispering Pines, NC 28327 · Water and Sewer Line and Related Structures Construction · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.651(k)(1) · Excavations
Serious$4,200$4,200May 16, 2017Final
Citation 1, item 2
29 CFR 1926.652(a)(1) · Trench protection
Serious$4,200$4,200May 16, 2017Final

Inspection 311939185 OPENED SEP 16, 2008Closed

Accident · Partial · Safety · 52 employees at the site · Closed Feb 27, 2009

Intersection Of Crosswinds Dr. And Bell Grove Dr., Hope Mills, NC 28348 · Water and Sewer Line and Related Structures Construction · OSHA's record · Phone and website on Google Maps

Incident on Sep 16, 2008: Employee's leg is fractured when struck by excavator bucket

On September 16, 2008, Employee #1 was struck by the bucket of an excavator duri ng sewer line installation. Emergency medical services transported him to a loca l hospital, where he was hospitalized with a broken leg.

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.651(j)(2) · Excavations
Serious$525$525Jan 29, 2009Closed
Citation 1, item 1b
29 CFR 1926.651(k)(1) · Excavations
Serious$0$0Jan 29, 2009Closed

Inspection 310505540 OPENED MAR 14, 2007Closed

Referral · Partial · Safety · 50 employees at the site · Closed Apr 19, 2007

Rockfish Rd., Raeford, NC 28376 · Site Preparation Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.200(g)(2) · Accident prevention signs and tags
Serious$375$375Mar 22, 2007Closed
Citation 2, item 1
29 CFR 1926.201(a) · Signaling
Other-than-serious$0$0Mar 22, 2007Closed
13 older inspections

Inspection 310041777 OPENED SEP 12, 2006Closed

Planned · Partial · Safety · 70 employees at the site · Closed Nov 13, 2006

South End Of Oberhills Sub-division, Spring Lake, NC 28390 · Water and Sewer Line and Related Structures Construction · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.651(j)(2) · Excavations
Serious$525$525Sep 20, 2006Closed
Citation 1, item 1b
29 CFR 1926.651(c)(2) · Excavations
Serious$0$0Sep 20, 2006Closed
Citation 1, item 1c
29 CFR 1926.651(k)(2) · Excavations
Serious$0$0Sep 20, 2006Closed
Citation 1, item 2
29 CFR 1926.652(a)(1) · Trench protection
Serious$525$0Sep 20, 2006Closed

Inspection 309317212 OPENED NOV 3, 2005Closed

Referral · Partial · Safety · 52 employees at the site · Closed Nov 17, 2005

211 Trolley Car Way, Morrisville, NC 27560 · Site Preparation Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 308779594 OPENED MAY 2, 2005Closed

Complaint · Partial · Safety · 52 employees at the site · Closed May 16, 2005

Arnold Palmer Dr. (brier Creek Subdiv.-phase Ii), Raleigh, NC 27607 · Site Preparation Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 307900357 OPENED AUG 11, 2004Closed

Planned · Partial · Safety · 70 employees at the site · Closed Aug 19, 2004

Hwy 87, Western Harnett Industrial Park, Sanford, NC 27330 · Site Preparation Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 307548123 OPENED APR 19, 2004Closed

Planned · Partial · Safety · 52 employees at the site · Closed Jun 29, 2004

Intersection Of Ezras St And Strickland Bridge Rd, Fayetteville, NC 28314 · Site Preparation Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.652(a)(1) · Trench protection
Repeat$2,000$2,000Apr 29, 2004Closed
Citation 2, item 1a
29 CFR 1926.1053(b)(1) · Ladders in construction
Serious$375$375Apr 29, 2004Closed
Citation 2, item 1b
29 CFR 1926.1060(a)(1)(iii) · Ladder and stairway training
Serious$0$0Apr 29, 2004Closed

Inspection 307545491 OPENED MAR 18, 2004Closed

Planned · Partial · Safety · 57 employees at the site · Closed May 21, 2004

Beacon Hill, East Side Of Strickland Bridge, Fayetteville, NC 28303 · Site Preparation Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.652(a)(1) · Trench protection
Serious$2,100$2,100Apr 7, 2004Closed
Citation 1, item 1b
29 CFR 1926.21(b)(2) · Construction safety training
Serious$0$0Apr 7, 2004Closed
Citation 1, item 1c
29 CFR 1926.651(j)(2) · Excavations
Serious$0$0Apr 7, 2004Closed
Citation 1, item 1d
29 CFR 1926.651(k)(2) · Excavations
Serious$0$0Apr 7, 2004Closed

Inspection 306591199 OPENED JUL 22, 2003Closed

Planned · Complete · Safety · 4 employees at the site · Closed Jul 22, 2003

205 Sheldon Road, Raleigh, NC 27610 · Site Preparation Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 304736564 OPENED OCT 8, 2001Closed

Complaint · Partial · Safety · 66 employees at the site · Closed Jan 29, 2002

Intersection Of Crosswinds Dr. And Bell Grove Dr., Hope Mills, NC 28348 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1910.254(d)(9)(iii) · Arc welding and cutting
Serious$625$500Oct 18, 2001Closed
Citation 1, item 1b
29 CFR 1910.254(d)(7) · Arc welding and cutting
Serious$0$0Oct 18, 2001Closed
Citation 1, item 1c
29 CFR 1910.254(a)(3) · Arc welding and cutting
Serious$0$0Oct 18, 2001Closed
Citation 1, item 2
29 CFR 1910.252(b)(2)(iii) · Welding fire safety
Serious$625$500Oct 18, 2001Closed
Citation 1, item 3a
29 CFR 1910.253(e)(3)(iic)(2) · Gas welding and cutting
Serious$313$0Oct 18, 2001Closed
Citation 1, item 3b
29 CFR 1910.253(e)(3)(iic)(3) · Gas welding and cutting
Serious$0$0Oct 18, 2001Closed
Citation 2, item 1
29 CFR 1910.215(a)(4) · Grinders and abrasive wheels
Other-than-serious$0$0Oct 18, 2001Closed
Citation 2, item 2
29 CFR 1910.215(d)(1) · Grinders and abrasive wheels
Other-than-serious$0$0Oct 18, 2001Closed

Inspection 302357413 OPENED DEC 15, 1998Closed

Planned · Partial · Safety · 84 employees at the site · Closed Mar 1, 1999

Spring Branch Rd. (bud Hawkins Ln.), Dunn, NC 28334 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.100(a) · Hard hats in construction
Serious$375$375Jan 28, 1999Closed
Citation 1, item 2a
29 CFR 1926.200(g)(1) · Accident prevention signs and tags
Serious$525$525Jan 28, 1999Closed
Citation 1, item 2b
29 CFR 1926.651(d) · Excavations
Serious$0$0Jan 28, 1999Closed
Citation 1, item 3a
29 CFR 1926.652(a)(1) · Trench protection
Serious$525$525Jan 28, 1999Closed
Citation 1, item 3b
29 CFR 1926.21(b)(2) · Construction safety training
Serious$0$0Jan 28, 1999Closed
Citation 1, item 3c
29 CFR 1926.651(k)(2) · Excavations
Serious$0$0Jan 28, 1999Closed

Inspection 302118203 OPENED MAR 23, 1998Closed

Referral · Partial · Safety · 60 employees at the site · Closed Jun 22, 1999

Hwy 301 S. (fayettville Memorial Cemetery), Fayetteville, NC 28305 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.200(g)(1) · Accident prevention signs and tags
Serious$525$525Apr 21, 1998Closed
Citation 1, item 1b
29 CFR 1926.651(d) · Excavations
Serious$0$0Apr 21, 1998Closed

Inspection 301960969 OPENED OCT 6, 1997Closed

Planned · Partial · Safety · 20 employees at the site · Closed Dec 4, 1997

Center Church Rd & Hwy 1, Sanford, NC 27330 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.21(b)(2) · Construction safety training
Serious$100$100Oct 29, 1997Closed

Inspection 111118246 OPENED APR 21, 1994Closed

Planned · Complete · Safety · 1 employee at the site · Closed Oct 27, 1994

1405 Poplar St., Goldsboro, NC 27530 · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Injury and illness logs

From the Form 300A summaries employers file with OSHA each year. Rate = recordable cases per 100 full-time workers.

In 2025, the Dunn site logged 6 recordable injuries or illnesses among about 260 workers: 2.3 per 100 full-time workers, against a median of 1.0 for its industry. Those cases cost 9 days away from work.

Site and yearWorkersCasesDays-away casesRateIndustry median
Wellons Construction, Inc.
Dunn · 2025
260 622.31.0

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.215 · Grinders and abrasive wheels

29 CFR 1910.215(a)(4)

(4) Work rests. On offhand grinding machines, work rests shall be used to support the work. They shall be of rigid construction and designed to be adjustable to compensate for wheel wear. Work rests shall be kept adjusted closely to the wheel with a maximum opening of one-eighth inch to prevent the work from being jammed between the wheel and the rest, which may cause wheel breakage. The work rest shall be securely clamped after each adjustment. The adjustment shall not be made with the wheel in motion.

29 CFR 1910.215(d)(1)

(d) Mounting—(1) Inspection. Immediately before mounting, all wheels shall be closely inspected and sounded by the user (ring test) to make sure they have not been damaged in transit, storage, or otherwise. The spindle speed of the machine shall be checked before mounting of the wheel to be certain that it does not exceed the maximum operating speed marked on the wheel. Wheels should be tapped gently with a light nonmetallic implement, such as the handle of a screwdriver for light wheels, or a wooden mallet for heavier wheels. If they sound cracked (dead), they shall not be used. This is known as the “Ring Test”.

29 CFR 1910.252 · Welding fire safety

29 CFR 1910.252(b)(2)(iii)

(iii) Protection from arc welding rays. Where the work permits, the welder should be enclosed in an individual booth painted with a finish of low reflectivity such as zinc oxide (an important factor for absorbing ultraviolet radiations) and lamp black, or shall be enclosed with noncombustible screens similarly painted. Booths and screens shall permit circulation of air at floor level. Workers or other persons adjacent to the welding areas shall be protected from the rays by noncombustible or flameproof screens or shields or shall be required to wear appropriate goggles.

29 CFR 1910.253 · Gas welding and cutting

29 CFR 1910.254 · Arc welding and cutting

29 CFR 1926.100 · Hard hats in construction

29 CFR 1926.1053 · Ladders in construction

29 CFR 1926.1060 · Ladder and stairway training

29 CFR 1926.200 · Accident prevention signs and tags

29 CFR 1926.201 · Signaling

29 CFR 1926.21 · Construction safety training

29 CFR 1926.600 · Equipment

29 CFR 1926.651 · Excavations

29 CFR 1926.652 · Trench protection

Other site preparation contractors employers in North Carolina

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.