Western Cascade Industries LLC has 11 OSHA inspections on record in Oregon, the first in 2000.
OSHA's last visit started on Feb 6, 2017 after a complaint, in Toledo.
Across those inspections OSHA issued 25 citation items: 21 serious, 1 repeat and 3 other-than-serious.
OSHA proposed $16,840 in penalties. After settlements and reviews the total is $16,640, down 1%.
Most often, OSHA cited 1910.147, lockout/tagout (8 items).
For context, across all manufacturing employers the median penalty per cited inspection since 2015 is $4,500. Western Cascade Industries LLC averages $180 over 1 cited inspection in that time.
Western Cascade Industries LLC also files yearly injury logs with OSHA, summarized below.
Citation items per year, by inspection date.
Oregon · latest 90 days of OSHA records
391employers cited
4 of them in the same industry
Get notified the morning OSHA posts each new citation in Oregon: the employer, the site address, the rules broken and the penalty.
Checking a subcontractor, a client or your own company? Watch Western Cascade Industries LLC and get notified the morning OSHA posts a new citation for it.
Incident on Aug 31, 2012: Worker hospitalized after being struck by a log
At approximately 9:30 a.m. on August 31, 2012, Employee #1, a 48-year-old male l aborer with Western Cascade Industries LLC, was straightening logs approximately eight-feet long by eighteen-inch diameter on a stepper to the log chain at the Mill. Part of the process was for the operator to eject (kick) logs that are of oversize lengths and diameter onto a conveyor to take them out of the system and eject them onto the ground. The line had shut down because of a problem further in the Mill. However, the log on the conveyor had not been ejected to the groun d. Employee #1 and operator where called into the Mill to help with the problem. As Employee #1 left his station, the log was automatically ejected and thrown i nto him. The log struck and fractured Employee #1's left leg. Employee #1 was ho spitalized as a result of this event.
Incident on Nov 5, 2009: Employee strikes head on stationary saw blade
At approximately 1:30 p.m. on November 5, 2009, Employee #1 was using a chop saw with a 60-inch blade to trim logs. The four belts that drive the saw shed one o f the belts. Employee #1 stopped the saw and belts, climbed in behind the metal cage/guard, and tried to place the belt back on the pulley. He slipped, struck h is head on the stationary saw blade, and fell 5 feet onto an active conveyor, wh ich took him toward the chipper. Employee #1 scrambled from the conveyor and ret urned to the operator's station. He called the mill manager for medical assistan ce. He was hospitalized for treatment.
Incident on Dec 16, 2004: Employee is injured when caught in step feeder
At approximately 8:30 a.m. on December 16, 2004, Employee #1, an electrical mill wright, entered into a log step feeder to adjust the limit switches during a shu t down without informing any coworkers. The machine operator reenergized the mac hine, unaware that Employee #1 had entered the machine. When the step feeder cyc led, Employee #1 was struck in the chest and became caught between the framework and the step feeder plate. The machine was shut down and Employee #1 was extric ated. After treatment at a local hospital, he was airlifted to OHSU in Portland, where he was hospitalized for a lacerated liver.
Incident on May 30, 2003: Employee injured when arm pulled into feed rolls
At 7:00 p.m. on May 30, 2003, Employee #1 was attempting to remove a broken boar d from a planer when his right hand and arm were pulled into the out feed rolls. Employee #1 reached in with his right hand to move a piece of a broken board in to the out feed rolls when his fingers were caught between the rolls and the boa rd. His hand and arm were pulled into the rolls and he was able to extricate him self and yell for help. First aid was rendered until Emergency Medical Services arrived at which time he was taken to a local hospital and then transferred by h elicopter to OHSU for surgery and skin grafts.
From the Form 300A summaries employers file with OSHA each year. Rate = recordable cases per 100 full-time workers.
In 2023, the Toledo site logged 9 recordable injuries or illnesses among about 67 workers: 15.7 per 100 full-time workers, against a median of 4.2 for its industry. Those cases cost 75 days away from work.
Site and year
Workers
Cases
Days-away cases
Rate
Industry median
Western Cascade Industries
Toledo · 2023
67
9
6
15.7
4.2
Included with any plan: 1 more yearly log from these sites, back to 2018, with each site's average rate over its latest three years. Already a subscriber? Sign in.
(4) Energy control procedure. (i) Procedures shall be developed, documented and utilized for the control of potentially hazardous energy when employees are engaged in the activities covered by this section.
29 CFR 1910.147(c)(4)(ii)
(ii) The procedures shall clearly and specifically outline the scope, purpose, authorization, rules, and techniques to be utilized for the control of hazardous energy, and the means to enforce compliance including, but not limited to, the following:
29 CFR 1910.147(c)(6)(i)
(6) Periodic inspection. (i) The employer shall conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirements of this standard are being followed.
Alert subscribers get notified of each newly cited employer in Oregon the morning it is posted. See the alert plans.
Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.