OSHA SearchOSHA records by employer

White Star NYC Inc.: OSHA inspections and violations

New York, New York · Site Preparation Contractors · NAICS 238910

1inspections
3citation items
$21,000current penalties
Mar 12, 2020last inspection

White Star NYC Inc. has one OSHA inspection on record in New York.

OSHA opened it on Mar 12, 2020 on a referral, in New York.

From that inspection OSHA issued 3 citation items: 3 serious.

OSHA proposed $32,965 in penalties. After settlements and reviews the total is $21,000, down 36%.

Most often, OSHA cited 1926.854, removal of walls, masonry sections, and chimneys (2 items).

For context, across all construction employers the median penalty per cited inspection since 2015 is $3,080. White Star NYC Inc. averages $21,000 over 1 cited inspection in that time.

White Star NYC Inc.: OSHA citation items per year, 2020 to 2020
Citation items per year, by inspection date.

New York · latest 90 days of OSHA records

362employers cited

9 of them in the same industry

Get notified the morning OSHA posts each new citation in New York: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in New York

Checking a subcontractor, a client or your own company? Watch White Star NYC Inc. and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 344696786 OPENED MAR 12, 2020Closed

Referral · Complete · Safety · 21 employees at the site · Closed Feb 25, 2022

1975 Madison Ave., New York, NY 10035 · Site Preparation Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.854(d) · Removal of walls, masonry sections, and chimneys
Serious$12,145$8,150Jun 23, 2020Final
Citation 1, item 2
29 CFR 1926.854(i) · Removal of walls, masonry sections, and chimneys
Serious$12,145$8,150Jun 23, 2020Final
Citation 1, item 3
29 CFR 1926.859(g) · Mechanical demolition
Serious$8,675$4,700Jun 23, 2020Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.854 · Removal of walls, masonry sections, and chimneys

29 CFR 1926.854(d)

(d) Structural or load-supporting members on any floor shall not be cut or removed until all stories above such a floor have been demolished and removed. This provision shall not prohibit the cutting of floor beams for the disposal of materials or for the installation of equipment, provided that the requirements of §§ 1926.853 and 1926.855 are met.

29 CFR 1926.854(i)

(i) Walls, which are to serve as retaining walls against which debris will be piled, shall not be so used unless capable of safely supporting the imposed load.

29 CFR 1926.859 · Mechanical demolition

29 CFR 1926.859(g)

(g) During demolition, continuing inspections by a competent person shall be made as the work progresses to detect hazards resulting from weakened or deteriorated floors, or walls, or loosened material. No employee shall be permitted to work where such hazards exist until they are corrected by shoring, bracing, or other effective means.

Other site preparation contractors employers in New York

Alert subscribers get notified of each newly cited employer in New York the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.