Berlin, Connecticut · All Other Specialty Trade Contractors · NAICS 238990

2inspections
18citation items
$20,000current penalties
Aug 30, 2023last inspection

OSHA has inspected Window Restorations of Connecticut 2 times in Connecticut since 2023.

The latest one began on Aug 30, 2023 after a complaint, in Berlin; the case is still open.

Those inspections ended with 18 citation items: 16 serious and 2 other-than-serious.

Penalties were first proposed at $44,662 and now stand at $20,000, 55% lower after settlements or reviews.

Lead in construction comes up most often in these citations: 11 items under 1926.62.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and Window Restorations of Connecticut averages $10,000 (2 cited inspections).

Window Restorations of Connecticut: OSHA citation items per year, 2023 to 2023
Citation items per year, by inspection date.

Connecticut · latest 90 days of OSHA records

86employers cited

3 of them in the same industry

Get notified the morning OSHA posts each new citation in Connecticut: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Connecticut

Checking a subcontractor, a client or your own company? Watch Window Restorations of Connecticut and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 346948698 OPENED AUG 30, 2023Open

Complaint · Partial · Health · 7 employees at the site · Open

600 Four Rod Road, Berlin, CT 06037 · All Other Specialty Trade Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.62(c)(1) · Lead in construction
Serious$5,531$4,000Feb 28, 2024Final
Citation 1, item 1b
29 CFR 1926.62(e)(1) · Lead in construction
Serious$0$0Feb 28, 2024Final
Citation 1, item 1c
29 CFR 1926.62(d)(1)(i) · Lead in construction
Serious$5,531$0Feb 28, 2024Final
Citation 1, item 1d
29 CFR 1926.62(d)(1)(iii) · Lead in construction
Serious$0$0Feb 28, 2024Final
Citation 1, item 3a
29 CFR 1926.62(d)(2)(v)(a) · Lead in construction
Serious$5,531$3,000Feb 28, 2024Final
Citation 1, item 3b
29 CFR 1926.62(f)(2)(i) · Lead in construction
Serious$0$0Feb 28, 2024Final
Citation 1, item 4a
29 CFR 1926.62(d)(2)(v)(b) · Lead in construction
Serious$5,531$2,500Feb 28, 2024Final
Citation 1, item 4b
29 CFR 1926.62(g)(1)(i) · Lead in construction
Serious$0$0Feb 28, 2024Final
Citation 1, item 5a
29 CFR 1926.62(d)(2)(v)(f) · Lead in construction
Serious$5,531$2,500Feb 28, 2024Final
Citation 1, item 5b
29 CFR 1926.62(l)(2) · Lead in construction
Serious$0$0Feb 28, 2024Final
Citation 1, item 6a
29 CFR 1926.62(h)(1) · Lead in construction
Serious$3,687$2,000Feb 28, 2024Final
Citation 1, item 6b
29 CFR 1926.302(b)(4) · Power-operated hand tools
Serious$0$0Feb 28, 2024Final

Inspection 346949142 OPENED AUG 30, 2023Open

Referral · Partial · Safety · 7 employees at the site · Open

600 Four Rod Road, Berlin, CT 06037 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1910.22(a)(1) · Walking-working surfaces
Other-than-serious$4,702$0Feb 28, 2024Final
Citation 1, item 1b
29 CFR 1910.22(a)(2) · Walking-working surfaces
Other-than-serious$0$0Feb 28, 2024Final
Citation 1, item 2a
29 CFR 1910.213(c)(1) · Woodworking machinery
Serious$2,350$2,000Feb 28, 2024Final
Citation 1, item 2b
29 CFR 1910.213(c)(2) · Woodworking machinery
Serious$0$0Feb 28, 2024Final
Citation 1, item 3
29 CFR 1910.303(b)(2) · Electrical equipment, general requirements
Serious$2,350$2,000Feb 28, 2024Final
Citation 1, item 4
29 CFR 1910.304(g)(5) · Grounding and circuit protection
Serious$3,918$2,000Feb 28, 2024Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.213 · Woodworking machinery

29 CFR 1910.213(c)(1)

(c) Hand-fed ripsaws. (1) Each circular hand-fed ripsaw shall be guarded by a hood which shall completely enclose that portion of the saw above the table and that portion of the saw above the material being cut. The hood and mounting shall be arranged so that the hood will automatically adjust itself to the thickness of and remain in contact with the material being cut but it shall not offer any considerable resistance to insertion of material to saw or to passage of the material being sawed. The hood shall be made of adequate strength to resist blows and strains incidental to reasonable operation, adjusting, and handling, and shall be so designed as to protect the operator from flying splinters and broken saw teeth. It shall be made of material that is soft enough so that it will be unlikely to cause tooth breakage. The hood shall be so mounted as to insure that its operation will be po

29 CFR 1910.213(c)(2)

(2) Each hand-fed circular ripsaw shall be furnished with a spreader to prevent material from squeezing the saw or being thrown back on the operator. The spreader shall be made of hard tempered steel, or its equivalent, and shall be thinner than the saw kerf. It shall be of sufficient width to provide adequate stiffness or rigidity to resist any reasonable side thrust or blow tending to bend or throw it out of position. The spreader shall be attached so that it will remain in true alignment with the saw even when either the saw or table is tilted. The provision of a spreader in connection with grooving, dadoing, or rabbeting is not required. On the completion of such operations, the spreader shall be immediately replaced.

29 CFR 1910.22 · Walking-working surfaces

29 CFR 1910.22(a)(1)

(1) All places of employment, passageways, storerooms, service rooms, and walking-working surfaces are kept in a clean, orderly, and sanitary condition.

29 CFR 1910.303 · Electrical equipment, general requirements

29 CFR 1910.304 · Grounding and circuit protection

29 CFR 1926.302 · Power-operated hand tools

29 CFR 1926.62 · Lead in construction

Other all other specialty trade contractors employers in Connecticut

Alert subscribers get notified of each newly cited employer in Connecticut the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.