Since 2025, OSHA inspectors have visited WSC Contractor Import, Inc. in New Jersey 5 times.

The most recent inspection opened on Jun 22, 2026 on a referral, in Freehold and is still open.

In all, OSHA issued 9 citation items: 6 serious and 3 repeat.

The penalties, $66,531 in total, stand where OSHA first set them.

The rule cited most here is 1926.451 (scaffolds, general requirements), 5 times.

Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. WSC Contractor Import, Inc. averages $13,306 across 5 cited inspections.

WSC Contractor Import, Inc.: OSHA citation items per year, 2025 to 2026
Citation items per year, by inspection date.

New Jersey · latest 90 days of OSHA records

272employers cited

7 of them in the same industry

Get notified the morning OSHA posts each new citation in New Jersey: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in New Jersey

Checking a subcontractor, a client or your own company? Watch WSC Contractor Import, Inc. and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 349010645 OPENED JUN 22, 2026Open

Referral · Partial · Safety · 9 employees at the site · Open

31 Georgetown Drive, Freehold, NJ 07728 · Roofing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.501(b)(13) · Fall protection in construction
Serious$4,965$4,965Sep 21, 2026Final

Inspection 348946435 OPENED MAY 19, 2026Open

Inspection · Complete · Safety · 6 employees at the site · Open

147, 149, 151, 153, 155, 157 Essex Drive, Sicklerville, NJ 08081 · Siding Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.452(j)(2) · Rules for each type of scaffold
Serious$5,958$5,958Jun 10, 2026Final
Citation 2, item 1
29 CFR 1926.451(g)(4)(i) · Scaffolds, general requirements
Repeat$11,916$11,916Jun 10, 2026Final

Inspection 348906546 OPENED APR 28, 2026Open

Referral · Partial · Safety · 6 employees at the site · Open

22 Georgetown Drive, Freehold, NJ 07728 · Siding Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.501(b)(13) · Fall protection in construction
Serious$4,965$4,965Sep 21, 2026Final
Citation 1, item 2
29 CFR 1926.502(d)(17) · Fall protection systems
Serious$4,965$4,965Sep 21, 2026Final

Inspection 348900655 OPENED APR 22, 2026Open

Inspection · Complete · Safety · 6 employees at the site · Open

100, 102, 104, 106 Clinton Street, Sicklerville, NJ 08081 · Siding Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.451(c)(3) · Scaffolds, general requirements
Repeat$11,916$11,916Jun 10, 2026Final
Citation 1, item 2
29 CFR 1926.451(g)(4)(i) · Scaffolds, general requirements
Repeat$11,916$11,916Jun 10, 2026Final

Inspection 348629437 OPENED DEC 4, 2025Open

Planned · Complete · Safety · 5 employees at the site · Open

84 Messina Loop, Mullica Hill, NJ 08062 · Siding Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.451(c)(3) · Scaffolds, general requirements
Serious$4,965$4,965Jan 9, 2026Final
Citation 1, item 2
29 CFR 1926.451(g)(4)(i) · Scaffolds, general requirements
Serious$4,965$4,965Jan 9, 2026Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(c)(3)

(3) Supported scaffold poles, legs, posts, frames, and uprights shall be plumb and braced to prevent swaying and displacement.

29 CFR 1926.451(g)(4)(i)

(i) Guardrail systems shall be installed along all open sides and ends of platforms. Guardrail systems shall be installed before the scaffold is released for use by employees other than erection/dismantling crews.

29 CFR 1926.452 · Rules for each type of scaffold

29 CFR 1926.452(j)(2)

(2) Poles shall be secured to the structure by rigid triangular bracing or equivalent at the bottom, top, and other points as necessary. When the pump jack has to pass bracing already installed, an additional brace shall be installed approximately 4 feet (1.2 m) above the brace to be passed, and shall be left in place until the pump jack has been moved and the original brace reinstalled.

29 CFR 1926.501 · Fall protection in construction

29 CFR 1926.502 · Fall protection systems

Other siding contractors employers in New Jersey

Alert subscribers get notified of each newly cited employer in New Jersey the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.