OSHA SearchOSHA records by employer

WYNN Site Development, Inc.: OSHA inspections and violations

Durham, North Carolina · Site Preparation Contractors · NAICS 238910

3inspections
2citation items
$8,675current penalties
Apr 13, 2026last inspection

Since 2015, OSHA inspectors have visited WYNN Site Development, Inc. in North Carolina 3 times.

The most recent inspection opened on Apr 13, 2026 after a complaint, in Durham.

In all, OSHA issued 2 citation items: 1 serious and 1 other-than-serious.

The proposed penalties came to $9,900; today they stand at $8,675, 12% less.

Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. WYNN Site Development, Inc. averages $4,338 across 2 cited inspections.

WYNN Site Development, Inc.: OSHA citation items per year, 2015 to 2026
Citation items per year, by inspection date.

North Carolina · latest 90 days of OSHA records

236employers cited

3 of them in the same industry

Get notified the morning OSHA posts each new citation in North Carolina: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in North Carolina

Checking a subcontractor, a client or your own company? Watch WYNN Site Development, Inc. and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 348871609 OPENED APR 13, 2026Closed

Complaint · Partial · Safety · 5 employees at the site · Closed May 26, 2026

739 Baptist Road, Durham, NC 27703 · Water and Sewer Line and Related Structures Construction · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 348370941 OPENED JUL 11, 2025Closed

Referral · Partial · Safety · 15 employees at the site · Closed Jan 6, 2026

765 Brick Mill Road, Coats, NC 27521 · Site Preparation Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.1204(e)(1) · Permit-required confined space program
Serious$5,000$5,000Nov 14, 2025Final

Inspection 341055358 OPENED NOV 12, 2015Closed

Planned · Complete · Safety · 60 employees at the site · Closed Dec 17, 2015

Durham Solar Site Cheek Rooad, Durham, NC 27704 · Site Preparation Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.200(a) · Accident prevention signs and tags
Other-than-serious$4,900$3,675Nov 20, 2015Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.1204 · Permit-required confined space program

29 CFR 1926.1204(e)(1)

(1) Test conditions in the permit space to determine if acceptable entry conditions exist before changes to the space's natural ventilation are made, and before entry is authorized to begin, except that, if an employer demonstrates that isolation of the space is infeasible because the space is large or is part of a continuous system (such as a sewer), the employer must:

29 CFR 1926.200 · Accident prevention signs and tags

29 CFR 1926.200(a)

(a) General. Signs and symbols required by this subpart shall be visible at all times when work is being performed, and shall be removed or covered promptly when the hazards no longer exist.

Other site preparation contractors employers in North Carolina

Alert subscribers get notified of each newly cited employer in North Carolina the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.