OSHA SearchOSHA records by employer

XR Group Corp.: OSHA inspections and violations

Ridgewood, New York · Residential Remodelers · NAICS 236118

1inspections
3citation items
$5,544current penalties
Sep 11, 2018last inspection

OSHA inspectors have visited XR Group Corp. in New York one time.

It opened on Sep 11, 2018 after a complaint, in Ridgewood.

In all, OSHA issued 3 citation items: 3 serious.

The penalties, $5,544 in total, stand where OSHA first set them.

Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. XR Group Corp. averages $5,544 across 1 cited inspection.

XR Group Corp.: OSHA citation items per year, 2018 to 2018
Citation items per year, by inspection date.

New York · latest 90 days of OSHA records

353employers cited

3 of them in the same industry

Get notified the morning OSHA posts each new citation in New York: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in New York

Checking a subcontractor, a client or your own company? Watch XR Group Corp. and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 343465217 OPENED SEP 11, 2018Closed

Complaint · Partial · Safety · 3 employees at the site · Closed Mar 29, 2023

18-87 Cornelia Ave, Ridgewood, NY 11385 · Residential Remodelers · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.304(h)(1) · Woodworking tools
Serious$2,772$2,772Jan 9, 2019Final
Citation 1, item 2a
29 CFR 1926.403(e) · Electrical equipment on job sites
Serious$2,772$2,772Jan 9, 2019Final
Citation 1, item 2b
29 CFR 1926.405(b)(2) · Job-site wiring
Serious$0$0Jan 9, 2019Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.304 · Woodworking tools

29 CFR 1926.304(h)(1)

(h) Hand-fed crosscut table saws. (1) Each circular crosscut table saw shall be guarded by a hood which shall meet all the requirements of paragraph (i)(1) of this section for hoods for circular ripsaws.

29 CFR 1926.403 · Electrical equipment on job sites

29 CFR 1926.403(e)

(e) Splices. Conductors shall be spliced or joined with splicing devices designed for the use or by brazing, welding, or soldering with a fusible metal or alloy. Soldered splices shall first be so spliced or joined as to be mechanically and electrically secure without solder and then soldered. All splices and joints and the free ends of conductors shall be covered with an insulation equivalent to that of the conductors or with an insulating device designed for the purpose.

29 CFR 1926.405 · Job-site wiring

29 CFR 1926.405(b)(2)

(2) Covers and canopies. All pull boxes, junction boxes, and fittings shall be provided with covers. If metal covers are used, they shall be grounded. In energized installations each outlet box shall have a cover, faceplate, or fixture canopy. Covers of outlet boxes having holes through which flexible cord pendants pass shall be provided with bushings designed for the purpose or shall have smooth, well-rounded surfaces on which the cords may bear.

Other residential remodelers employers in New York

Alert subscribers get notified of each newly cited employer in New York the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.