OSHA inspectors have visited Yadira Palacio in Tennessee one time.

It opened on Oct 5, 2016 as a planned inspection, in Powell.

In all, OSHA issued 8 citation items: 7 serious and 1 other-than-serious.

The penalties, $1,600 in total, stand where OSHA first set them.

The rule cited most here is 1926.451 (scaffolds, general requirements), 5 times.

Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. Yadira Palacio averages $1,600 across 1 cited inspection.

Yadira Palacio: OSHA citation items per year, 2016 to 2016
Citation items per year, by inspection date.

Tennessee · latest 90 days of OSHA records

344employers cited

6 of them in the same industry

Get notified the morning OSHA posts each new citation in Tennessee: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Tennessee

Checking a subcontractor, a client or your own company? Watch Yadira Palacio and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 341816148 OPENED OCT 5, 2016Closed

Planned · Complete · Safety · 5 employees at the site · Closed Sep 5, 2024

124 West Emory Rd, Powell, TN 37849 · Masonry Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.451(b)(1) · Scaffolds, general requirements
Serious$700$700Dec 5, 2016Final
Citation 1, item 1b
29 CFR 1926.451(e)(1) · Scaffolds, general requirements
Serious$0$0Dec 5, 2016Final
Citation 1, item 1c
29 CFR 1926.451(g)(4)(i) · Scaffolds, general requirements
Serious$0$0Dec 5, 2016Final
Citation 1, item 1d
29 CFR 1926.454(a) · Scaffold training
Serious$0$0Dec 5, 2016Final
Citation 1, item 2a
29 CFR 1926.451(c)(2)(i) · Scaffolds, general requirements
Serious$700$700Dec 5, 2016Final
Citation 1, item 2b
29 CFR 1926.451(f)(3) · Scaffolds, general requirements
Serious$0$0Dec 5, 2016Final
Citation 1, item 2c
29 CFR 1926.452(c)(2) · Rules for each type of scaffold
Serious$0$0Dec 5, 2016Final
Citation 2, item 1
29 CFR TDLWD RULE 800-01-04-.23(4)(A)
Other-than-serious$200$200Mar 8, 2017Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(b)(1)

(b) Scaffold platform construction. (1) Each platform on all working levels of scaffolds shall be fully planked or decked between the front uprights and the guardrail supports as follows:

29 CFR 1926.451(c)(2)(i)

(i) Footings shall be level, sound, rigid, and capable of supporting the loaded scaffold without settling or displacement.

29 CFR 1926.451(e)(1)

(1) When scaffold platforms are more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from another scaffold, structure, personnel hoist, or similar surface shall be used. Crossbraces shall not be used as a means of access.

29 CFR 1926.452 · Rules for each type of scaffold

29 CFR 1926.454 · Scaffold training

Other masonry contractors employers in Tennessee

Alert subscribers get notified of each newly cited employer in Tennessee the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.