OSHA SearchOSHA records by employer

Zeferino Marban Jimenez: OSHA inspections and violations

Charlotte, North Carolina · Masonry Contractors · NAICS 238140

1inspections
6citation items
$5,100current penalties
Jan 11, 2017last inspection

Zeferino Marban Jimenez has one OSHA inspection on record in North Carolina.

OSHA opened it on Jan 11, 2017 as a planned inspection, in Charlotte.

From that inspection OSHA issued 6 citation items: 6 serious.

OSHA proposed $5,100 in penalties and the amount has not been reduced.

Most often, OSHA cited 1926.451, scaffolds, general requirements (3 items).

For context, across all construction employers the median penalty per cited inspection since 2015 is $3,080. Zeferino Marban Jimenez averages $5,100 over 1 cited inspection in that time.

Zeferino Marban Jimenez: OSHA citation items per year, 2017 to 2017
Citation items per year, by inspection date.

North Carolina · latest 90 days of OSHA records

234employers cited

3 of them in the same industry

Get notified the morning OSHA posts each new citation in North Carolina: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in North Carolina

Checking a subcontractor, a client or your own company? Watch Zeferino Marban Jimenez and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 342026333 OPENED JAN 11, 2017Closed

Planned · Partial · Health · 5 employees at the site · Closed Feb 28, 2022

16424 Ardennes Drive, Charlotte, NC 28226 · Masonry Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 95.129(01)
Serious$1,000$1,000Feb 3, 2017Final
Citation 1, item 2
29 CFR 1926.451(g)(1)(vii) · Scaffolds, general requirements
Serious$2,100$2,100Feb 3, 2017Final
Citation 1, item 3a
29 CFR 1926.451(g)(4)(ii) · Scaffolds, general requirements
Serious$1,000$1,000Feb 3, 2017Final
Citation 1, item 3b
29 CFR 1926.451(c)(2)(v) · Scaffolds, general requirements
Serious$0$0Feb 3, 2017Final
Citation 1, item 3c
29 CFR 1926.602(c)(1)(ii) · Earthmovers and forklifts in construction
Serious$0$0Feb 3, 2017Final
Citation 1, item 4
29 CFR 1926.501(b)(1) · Fall protection in construction
Serious$1,000$1,000Feb 3, 2017Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(c)(2)(v)

(v) Fork-lifts shall not be used to support scaffold platforms unless the entire platform is attached to the fork and the fork-lift is not moved horizontally while the platform is occupied.

29 CFR 1926.451(g)(1)(vii)

(vii) For all scaffolds not otherwise specified in paragraphs (g)(1)(i) through (g)(1)(vi) of this section, each employee shall be protected by the use of personal fall arrest systems or guardrail systems meeting the requirements of paragraph (g)(4) of this section.

29 CFR 1926.451(g)(4)(ii)

(ii) The top edge height of toprails or equivalent member on supported scaffolds manufactured or placed in service after January 1, 2000 shall be installed between 38 inches (0.97 m) and 45 inches (1.2 m) above the platform surface. The top edge height on supported scaffolds manufactured and placed in service before January 1, 2000, and on all suspended scaffolds where both a guardrail and a personal fall arrest system are required shall be between 36 inches (0.9 m) and 45 inches (1.2 m). When conditions warrant, the height of the top edge may exceed the 45-inch height, provided the guardrail system meets all other criteria of paragraph (g)(4).

29 CFR 1926.501 · Fall protection in construction

29 CFR 1926.602 · Earthmovers and forklifts in construction

Other masonry contractors employers in North Carolina

Alert subscribers get notified of each newly cited employer in North Carolina the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.