OSHA SearchOSHA records by employer

29 CFR 1915.163: Ship's piping systems

Subpart J—Ship's Machinery and Piping Systems

1citations since 2015
1employers cited
100%serious, willful or repeat
$0median penalty per item

OSHA has cited 29 CFR 1915.163 1 times since 2015, against 1 employers. Penalties on these items add up to $0 at their current amounts.

Citations per year

The parts of the rule cited most

1915.163(a)(1) · 1 citations

(1) The isolation and shutoff valves connecting the dead system with the live system or systems shall be secured, blanked, and then locked or tagged, in accordance with § 1915.89, indicating that employees are working on the systems. The lock or tag shall not be removed or the valves unblanked until it is determined that this may be done without creating a hazard to the employees working on the system, or until the work on the system is completed, in accordance with § 1915.89. When valves are welded instead of bolted, at least two isolation and shutoff valves connecting the dead system with the live system or systems shall be secured, and then locked or tagged, in accordance with § 1915.89.

Industries cited most

  • Manufacturing 1

States cited most