OSHA SearchOSHA records by employer

29 CFR 1926.704: Requirements for precast concrete

Subpart Q—Concrete and Masonry Construction

18citations since 2015
18employers cited
72%serious, willful or repeat
$5,500median penalty per item

OSHA has cited 29 CFR 1926.704 18 times since 2015, against 18 employers. Penalties on these items add up to $110,763 at their current amounts.

Citations per year

The parts of the rule cited most

1926.704(a) · 14 citations

(a) Precast concrete wall units, structural framing, and tilt-up wall panels shall be adequately supported to prevent overturning and to prevent collapse until permanent connections are completed.

1926.704(e) · 3 citations

(e) No employee shall be permitted under precast concrete members being lifted or tilted into position except those employees required for the erection of those members.

1926.704(d) · 1 citations

(d) Lifting hardware shall be capable of supporting at least five times the maximum intended load applied or transmitted to the lifting hardware.

Industries cited most

  • Construction 17
  • Manufacturing 1

States cited most