OSHA SearchOSHA records by employer

A & R Ironworks: OSHA inspections and violations

Atlanta, Georgia · Forging and Stamping · NAICS 332116

2inspections
9citation items
$15,969current penalties
Aug 15, 2017last inspection

OSHA has inspected A & R Ironworks 2 times in Georgia since 2016.

The latest one began on Aug 15, 2017 to follow up on an earlier case, in Atlanta.

Those inspections ended with 9 citation items: 9 serious.

Penalties were first proposed at $26,615 and now stand at $15,969, 40% lower after settlements or reviews.

Respiratory protection comes up most often in these citations: 4 items under 1910.134.

How that compares: the median penalty per cited inspection for manufacturing employers since 2015 is $3,600, and A & R Ironworks averages $15,969 (1 cited inspection).

A & R Ironworks: OSHA citation items per year, 2016 to 2017
Citation items per year, by inspection date.

Georgia · latest 90 days of OSHA records

150employers cited

Get notified the morning OSHA posts each new citation in Georgia: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Georgia

Checking a subcontractor, a client or your own company? Watch A & R Ironworks and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 342550027 OPENED AUG 15, 2017Closed

Follow-up · No inspection · Health · Closed Aug 31, 2017

552 Decatur Street Se, Atlanta, GA 30312 · Forging and Stamping · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 341860666 OPENED OCT 19, 2016Closed

Referral · Partial · Health · 45 employees at the site · Closed May 31, 2017

552 Decatur Street Se, Atlanta, GA 30312 · Forging and Stamping · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.107(b)(5)(i) · Spray painting and finishing
Serious$3,802$2,281Apr 17, 2017Final
Citation 1, item 2
29 CFR 1910.107(b)(5)(iv) · Spray painting and finishing
Serious$3,802$2,281Apr 17, 2017Final
Citation 1, item 3
29 CFR 1910.107(b)(10) · Spray painting and finishing
Serious$3,802$2,281Apr 17, 2017Final
Citation 1, item 4
29 CFR 1910.107(e)(9) · Spray painting and finishing
Serious$3,802$2,281Apr 17, 2017Final
Citation 1, item 5a
29 CFR 1910.134(c)(1) · Respiratory protection
Serious$3,802$2,281Apr 17, 2017Final
Citation 1, item 5b
29 CFR 1910.134(k) · Respiratory protection
Serious$0$0Apr 17, 2017Final
Citation 1, item 5c
29 CFR 1910.134(e)(1) · Respiratory protection
Serious$0$0Apr 17, 2017Final
Citation 1, item 5d
29 CFR 1910.134(f)(1) · Respiratory protection
Serious$0$0Apr 17, 2017Final
Citation 1, item 6
29 CFR 1910.252(b)(2)(iii) · Welding fire safety
Serious$7,605$4,563Apr 17, 2017Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.107 · Spray painting and finishing

29 CFR 1910.107(b)(10)

(10) Illumination. When spraying areas are illuminated through glass panels or other transparent materials, only fixed lighting units shall be used as a source of illumination. Panels shall effectively isolate the spraying area from the area in which the lighting unit is located, and shall be of a noncombustible material of such a nature or so protected that breakage will be unlikely. Panels shall be so arranged that normal accumulations of residue on the exposed surface of the panel will not be raised to a dangerous temperature by radiation or conduction from the source of illumination.

29 CFR 1910.107(b)(5)(i)

(i) The spraying operations except electrostatic spraying operations shall be so designed, installed and maintained that the average air velocity over the open face of the booth (or booth cross section during spraying operations) shall be not less than 100 linear feet per minute. Electrostatic spraying operations may be conducted with an air velocity over the open face of the booth of not less than 60 linear feet per minute, or more, depending on the volume of the finishing material being applied and its flammability and explosion characteristics. Visible gauges or audible alarm or pressure activated devices shall be installed to indicate or insure that the required air velocity is maintained. Filter rolls shall be inspected to insure proper replacement of filter media.

29 CFR 1910.107(b)(5)(iv)

(iv) Space within the spray booth on the downstream and upstream sides of filters shall be protected with approved automatic sprinklers.

29 CFR 1910.134 · Respiratory protection

29 CFR 1910.252 · Welding fire safety

Other forging and stamping employers in Georgia

Alert subscribers get notified of each newly cited employer in Georgia the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.