OSHA SearchOSHA records by employer

Action Systems, Inc.: OSHA inspections and violations

Sioux Falls, South Dakota · Electrical Contractors and Other Wiring Installation Contractors · NAICS 238210

1inspections
5citation items
$9,103current penalties
Jan 10, 2025last inspection

OSHA has inspected Action Systems, Inc. once in South Dakota.

The inspection began on Jan 10, 2025 on a referral, in Sioux Falls.

That inspection ended with 5 citation items: 5 serious.

Penalties were first proposed at $18,205 and now stand at $9,103, 50% lower after settlements or reviews.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,078, and Action Systems, Inc. averages $9,103 (1 cited inspection).

Action Systems, Inc.: OSHA citation items per year, 2025 to 2025
Citation items per year, by inspection date.

Want to know if OSHA cites Action Systems, Inc. again? Add it to a watchlist and we will email you the morning the citation shows up.

Watch this company

Inspection history

Inspection 347971145 OPENED JAN 10, 2025Closed

Referral · Partial · Safety · 7 employees at the site · Closed Jun 11, 2026

I229 And Benson Road, Sioux Falls, SD 57104 · Electrical Contractors and Other Wiring Installation Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.20(b)(2) · Construction safety programs
Serious$11,585$5,793May 23, 2025Final
Citation 1, item 1b
29 CFR 1926.21(b)(2) · Construction safety training
Serious$0$0May 23, 2025Final
Citation 1, item 2a
29 CFR 1926.1427(a) · Operator training, certification, and evaluation
Serious$6,620$3,310May 23, 2025Final
Citation 1, item 2b
29 CFR 1926.1425(c)(3) · Keeping clear of the load
Serious$0$0May 23, 2025Final
Citation 1, item 2c
29 CFR 1926.1412(f)(1) · Inspections
Serious$0$0May 23, 2025Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.1412 · Inspections

29 CFR 1926.1412(f)(1)

(f) Annual/comprehensive. (1) At least every 12 months the equipment must be inspected by a qualified person in accordance with paragraph (d) of this section (each shift) except that the corrective action set forth in paragraphs (f)(4), (f)(5), and (f)(6) of this section must apply in place of the corrective action required by paragraphs (d)(2) and (d)(3) of this section.

29 CFR 1926.1425 · Keeping clear of the load

29 CFR 1926.1425(c)(3)

(3) The materials must be rigged by a qualified rigger.

29 CFR 1926.1427 · Operator training, certification, and evaluation

29 CFR 1926.1427(a)

(a) General requirements for operators. The employer must ensure that each operator is trained, certified/licensed, and evaluated in accordance with this section before operating any equipment covered under subpart CC, except for the equipment listed in paragraph (a)(2) of this section.

29 CFR 1926.20 · Construction safety programs

29 CFR 1926.21 · Construction safety training

Other electrical contractors and other wiring installation contractors employers in South Dakota

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.