Advanced Explosives Demolition, Inc.: OSHA inspections and violations

Wilmington, Delaware · Site Preparation Contractors · NAICS 238910

1inspections
3citation items
$3,960current penalties
Jun 16, 2015last inspection

OSHA has inspected Advanced Explosives Demolition, Inc. once in Delaware.

The inspection began on Jun 16, 2015 on a referral, in Wilmington.

That inspection ended with 3 citation items: 3 serious.

Penalties were first proposed at $3,960 and still stand at $3,960.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and Advanced Explosives Demolition, Inc. averages $3,960 (1 cited inspection).

Advanced Explosives Demolition, Inc.: OSHA citation items per year, 2015 to 2015
Citation items per year, by inspection date.

Delaware · latest 90 days of OSHA records

30employers cited

Get notified the morning OSHA posts each new citation in Delaware: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Delaware

Checking a subcontractor, a client or your own company? Watch Advanced Explosives Demolition, Inc. and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 340710201 OPENED JUN 16, 2015Closed

Referral · Partial · Safety · 5 employees at the site · Closed Nov 9, 2016

100 E. 16th Street, Wilmington, DE 19809 · Site Preparation Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.850(j) · Preparatory operations
Serious$2,520$2,520Dec 14, 2015Final
Citation 1, item 1b
29 CFR 1926.854(d) · Removal of walls, masonry sections, and chimneys
Serious$0$0Dec 14, 2015Final
Citation 1, item 2
29 CFR 1926.859(g) · Mechanical demolition
Serious$1,440$1,440Dec 14, 2015Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.850 · Preparatory operations

29 CFR 1926.850(j)

(j) Except for the cutting of holes in floors for chutes, holes through which to drop materials, preparation of storage space, and similar necessary preparatory work, the demolition of exterior walls and floor construction shall begin at the top of the structure and proceed downward. Each story of exterior wall and floor construction shall be removed and dropped into the storage space before commencing the removal of exterior walls and floors in the story next below.

29 CFR 1926.854 · Removal of walls, masonry sections, and chimneys

29 CFR 1926.854(d)

(d) Structural or load-supporting members on any floor shall not be cut or removed until all stories above such a floor have been demolished and removed. This provision shall not prohibit the cutting of floor beams for the disposal of materials or for the installation of equipment, provided that the requirements of §§ 1926.853 and 1926.855 are met.

29 CFR 1926.859 · Mechanical demolition

29 CFR 1926.859(g)

(g) During demolition, continuing inspections by a competent person shall be made as the work progresses to detect hazards resulting from weakened or deteriorated floors, or walls, or loosened material. No employee shall be permitted to work where such hazards exist until they are corrected by shoring, bracing, or other effective means.

Other site preparation contractors employers in Delaware

Alert subscribers get notified of each newly cited employer in Delaware the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.