OSHA SearchOSHA records by employer

Army Corps of Engineers, Dexter Dam: OSHA inspections and violations

Lowell, Oregon · Hydroelectric Power Generation · NAICS 221111

1inspections
4citation items
$0current penalties
Apr 3, 2015last inspection

Army Corps of Engineers, Dexter Dam has one OSHA inspection on record in Oregon.

OSHA opened it on Apr 3, 2015 as a planned inspection, in Lowell.

From that inspection OSHA issued 4 citation items: 3 serious and 1 repeat.

OSHA did not attach a penalty to any of these citations.

Most often, OSHA cited 1910.303, electrical equipment, general requirements (2 items).

For context, across all utility employers the median penalty per cited inspection since 2015 is $0. Army Corps of Engineers, Dexter Dam averages $0 over 1 cited inspection in that time.

Army Corps of Engineers, Dexter Dam: OSHA citation items per year, 2015 to 2015
Citation items per year, by inspection date.

Oregon · latest 90 days of OSHA records

377employers cited

Get notified the morning OSHA posts each new citation in Oregon: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Oregon

Checking a subcontractor, a client or your own company? Watch Army Corps of Engineers, Dexter Dam and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 340515097 OPENED APR 3, 2015Closed

Planned · Complete · Safety · Federal government · 20,000 employees at the site · Closed Oct 30, 2015

39149 Pengra Rd., Lowell, OR 97452 · Hydroelectric Power Generation · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.303(b)(2) · Electrical equipment, general requirements
Serious$0$0Sep 25, 2015Final
Citation 1, item 2
29 CFR 1910.303(g)(2)(i) · Electrical equipment, general requirements
Serious$0$0Sep 25, 2015Final
Citation 1, item 3
29 CFR 1910.304(g)(2)(ii) · Grounding and circuit protection
Serious$0$0Sep 25, 2015Final
Citation 2, item 1
29 CFR 1910.212(a)(5) · Machine guarding
Repeat$0$0Sep 25, 2015Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.212 · Machine guarding

29 CFR 1910.212(a)(5)

(5) Exposure of blades. When the periphery of the blades of a fan is less than seven (7) feet above the floor or working level, the blades shall be guarded. The guard shall have openings no larger than one-half ( 1/2) inch.

29 CFR 1910.303 · Electrical equipment, general requirements

29 CFR 1910.303(b)(2)

(2) Installation and use. Listed or labeled equipment shall be installed and used in accordance with any instructions included in the listing or labeling.

29 CFR 1910.303(g)(2)(i)

(2) Guarding of live parts. (i) Except as elsewhere required or permitted by this standard, live parts of electric equipment operating at 50 volts or more shall be guarded against accidental contact by use of approved cabinets or other forms of approved enclosures or by any of the following means:

29 CFR 1910.304 · Grounding and circuit protection

Other hydroelectric power generation employers in Oregon

Alert subscribers get notified of each newly cited employer in Oregon the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.