OSHA SearchOSHA records by employer

Atlas Wrecking Corp.: OSHA inspections and violations

Doral, Florida · Site Preparation Contractors · NAICS 238910

1inspections
2citation items
$6,452current penalties
Apr 2, 2024last inspection

Atlas Wrecking Corp. has one OSHA inspection on record in Florida.

OSHA opened it on Apr 2, 2024 on a referral, in Doral.

From that inspection OSHA issued 2 citation items: 2 serious.

OSHA proposed $6,452 in penalties and the amount has not been reduced.

For context, across all construction employers the median penalty per cited inspection since 2015 is $3,080. Atlas Wrecking Corp. averages $6,452 over 1 cited inspection in that time.

Atlas Wrecking Corp.: OSHA citation items per year, 2024 to 2024
Citation items per year, by inspection date.

Florida · latest 90 days of OSHA records

321employers cited

5 of them in the same industry

Get notified the morning OSHA posts each new citation in Florida: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Florida

Checking a subcontractor, a client or your own company? Watch Atlas Wrecking Corp. and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 347387250 OPENED APR 2, 2024Closed

Referral · Partial · Safety · 4 employees at the site · Closed Mar 23, 2026

10055 Nw 12th Street, Doral, FL 33172 · Site Preparation Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.850(c) · Preparatory operations
Serious$6,452$6,452Sep 18, 2024Final
Citation 1, item 1b
29 CFR 1926.417(b) · Lockout and tagging of circuits
Serious$0$0Sep 18, 2024Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.417 · Lockout and tagging of circuits

29 CFR 1926.417(b)

(b) Equipment and circuits. Equipment or circuits that are deenergized shall be rendered inoperative and shall have tags attached at all points where such equipment or circuits can be energized.

29 CFR 1926.850 · Preparatory operations

29 CFR 1926.850(c)

(c) All electric, gas, water, steam, sewer, and other service lines shall be shut off, capped, or otherwise controlled, outside the building line before demolition work is started. In each case, any utility company which is involved shall be notified in advance.

Other site preparation contractors employers in Florida

Alert subscribers get notified of each newly cited employer in Florida the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.