OSHA SearchOSHA records by employer

Bang Bang Designs LLC: OSHA inspections and violations

Phoenix, Arizona · All Other Professional, Scientific, and Technical Services · NAICS 541990

1inspections
21citation items
$1,400current penalties
Aug 13, 2020last inspection

OSHA inspectors have visited Bang Bang Designs LLC in Arizona one time.

It opened on Aug 13, 2020 after a complaint, in Phoenix.

In all, OSHA issued 21 citation items: 18 serious and 3 other-than-serious.

The proposed penalties came to $2,800; today they stand at $1,400, 50% less.

The rule cited most here is 1910.107 (spray painting and finishing), 7 times.

Among professional services employers, the typical cited inspection since 2015 ends with a $1,820 penalty. Bang Bang Designs LLC averages $1,400 across 1 cited inspection.

Bang Bang Designs LLC: OSHA citation items per year, 2020 to 2020
Citation items per year, by inspection date.

Arizona · latest 90 days of OSHA records

86employers cited

Get notified the morning OSHA posts each new citation in Arizona: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Arizona

Checking a subcontractor, a client or your own company? Watch Bang Bang Designs LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 344879820 OPENED AUG 13, 2020Closed

Complaint · Partial · Health · 7 employees at the site · Closed May 13, 2021

4040 N 22nd St, Phoenix, AZ 85016 · All Other Professional, Scientific, and Technical Services · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1910.107(b)(1) · Spray painting and finishing
Serious$600$300Nov 6, 2020Final
Citation 1, item 1b
29 CFR 1910.107(b)(2) · Spray painting and finishing
Serious$0$0Nov 6, 2020Final
Citation 1, item 1c
29 CFR 1910.107(b)(5)(i) · Spray painting and finishing
Serious$0$0Nov 6, 2020Final
Citation 1, item 1d
29 CFR 1910.107(b)(5)(iv) · Spray painting and finishing
Serious$0$0Nov 6, 2020Final
Citation 1, item 1e
29 CFR 1910.107(c)(4) · Spray painting and finishing
Serious$0$0Nov 6, 2020Final
Citation 1, item 1f
29 CFR 1910.107(d)(12) · Spray painting and finishing
Serious$0$0Nov 6, 2020Final
Citation 1, item 1g
29 CFR 1910.107(e)(2) · Spray painting and finishing
Serious$0$0Nov 6, 2020Final
Citation 1, item 2a
29 CFR 1910.134(c)(1) · Respiratory protection
Serious$600$300Nov 6, 2020Final
Citation 1, item 2b
29 CFR 1910.134(c)(2)(i) · Respiratory protection
Serious$0$0Nov 6, 2020Final
Citation 1, item 2c
29 CFR 1910.134(c)(2)(ii) · Respiratory protection
Serious$0$0Nov 6, 2020Final
Citation 1, item 2d
29 CFR 1910.134(e)(1) · Respiratory protection
Serious$0$0Nov 6, 2020Final
Citation 1, item 2e
29 CFR 1910.134(f)(2) · Respiratory protection
Serious$0$0Nov 6, 2020Final
Citation 1, item 2f
29 CFR 1910.134(k)(1) · Respiratory protection
Serious$0$0Nov 6, 2020Final
Citation 1, item 3a
29 CFR 1910.213(c)(1) · Woodworking machinery
Serious$800$400Nov 6, 2020Final
Citation 1, item 3b
29 CFR 1910.213(c)(2) · Woodworking machinery
Serious$0$0Nov 6, 2020Final
Citation 1, item 3c
29 CFR 1910.213(c)(3) · Woodworking machinery
Serious$0$0Nov 6, 2020Final
Citation 1, item 4a
29 CFR 1910.1200(e)(1) · Hazard communication
Serious$800$400Nov 6, 2020Final
Citation 1, item 4b
29 CFR 1910.1200(g)(1) · Hazard communication
Serious$0$0Nov 6, 2020Final
Citation 2, item 1a
29 CFR 1910.157(c)(1) · Portable fire extinguishers
Other-than-serious$0$0Nov 6, 2020Final
Citation 2, item 1b
29 CFR 1910.157(e)(2) · Portable fire extinguishers
Other-than-serious$0$0Nov 6, 2020Final
Citation 2, item 1c
29 CFR 1910.157(e)(3) · Portable fire extinguishers
Other-than-serious$0$0Nov 6, 2020Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.107 · Spray painting and finishing

29 CFR 1910.107(b)(1)

(b) Spray booths—(1) Construction. Spray booths shall be substantially constructed of steel, securely and rigidly supported, or of concrete or masonry except that aluminum or other substantial noncombustible material may be used for intermittent or low volume spraying. Spray booths shall be designed to sweep air currents toward the exhaust outlet.

29 CFR 1910.107(b)(2)

(2) Interiors. The interior surfaces of spray booths shall be smooth and continuous without edges and otherwise designed to prevent pocketing of residues and facilitate cleaning and washing without injury.

29 CFR 1910.107(b)(5)(i)

(i) The spraying operations except electrostatic spraying operations shall be so designed, installed and maintained that the average air velocity over the open face of the booth (or booth cross section during spraying operations) shall be not less than 100 linear feet per minute. Electrostatic spraying operations may be conducted with an air velocity over the open face of the booth of not less than 60 linear feet per minute, or more, depending on the volume of the finishing material being applied and its flammability and explosion characteristics. Visible gauges or audible alarm or pressure activated devices shall be installed to indicate or insure that the required air velocity is maintained. Filter rolls shall be inspected to insure proper replacement of filter media.

29 CFR 1910.1200 · Hazard communication

29 CFR 1910.134 · Respiratory protection

29 CFR 1910.157 · Portable fire extinguishers

29 CFR 1910.213 · Woodworking machinery

Other all other professional, scientific, and technical services employers in Arizona

Alert subscribers get notified of each newly cited employer in Arizona the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.