Inspection 349236521 OPENED OCT 21, 2026Open
1501 31st Ave. North, Birmingham, AL 35207 · All Other Miscellaneous Fabricated Metal Product Manufacturing · OSHA's record · Phone and website on Google Maps
No citations from this inspection so far.
Birmingham, Alabama · Structural Steel and Precast Concrete Contractors · NAICS 238120
Birmingham & Associates, Inc. has 9 OSHA inspections on record in Alabama, the first in 2002.
OSHA's last visit started on Oct 21, 2026 as part of a related case, in Birmingham, and the case has not closed yet.
Across those inspections OSHA issued 18 citation items: 16 serious, 1 repeat and 1 other-than-serious.
OSHA proposed $54,371 in penalties. After settlements and reviews the total is $38,258, down 30%.
Most often, OSHA cited 1926.453, aerial lifts (4 items).
For context, across all construction employers the median penalty per cited inspection since 2015 is $3,080. Birmingham & Associates, Inc. averages $9,079 over 2 cited inspections in that time.
Birmingham & Associates, Inc. also files yearly injury logs with OSHA, summarized below.
It reported 1 severe injury to OSHA since 2015.
Alabama · latest 90 days of OSHA records
95employers cited
Get notified the morning OSHA posts each new citation in Alabama: the employer, the site address, the rules broken and the penalty.
See who gets cited nextLatest cited in Alabama
Checking a subcontractor, a client or your own company? Watch Birmingham & Associates, Inc. and get notified the morning OSHA posts a new citation for it.
Watch this company1501 31st Ave. North, Birmingham, AL 35207 · All Other Miscellaneous Fabricated Metal Product Manufacturing · OSHA's record · Phone and website on Google Maps
No citations from this inspection so far.
901 2nd Court West, Birmingham, AL 35204 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1926.502(d)(21) · Fall protection systems |
Serious | $9,557 | $5,734 | Jan 13, 2022 | Final |
| Citation 1, item 2 29 CFR 1926.503(a)(2)(ii) · Fall protection training in construction |
Other-than-serious | $9,557 | $5,734 | Jan 13, 2022 | Final |
901 2nd Court West, Birmingham, AL 35204 · Roofing Contractors · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1926.760(a)(1) · Fall protection |
Serious | $9,557 | $6,690 | Dec 23, 2021 | Final |
105 Goodrich Drive, Birmingham, AL 35217 · Framing Contractors · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1a 29 CFR 1926.453(b)(2)(iv) · Aerial lifts |
Serious | $2,200 | $1,100 | Oct 17, 2012 | Final |
| Citation 1, item 1b 29 CFR 1926.454(a) · Scaffold training |
Serious | $0 | $0 | Oct 17, 2012 | Final |
27th Street And 29 St. Place, Birmingham, AL 35203 · Structural Steel and Precast Concrete Contractors · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1926.501(b)(10) · Fall protection in construction |
Serious | $2,500 | $1,625 | Apr 1, 2009 | Closed |
| Citation 1, item 2a 29 CFR 1926.502(a)(2) · Fall protection systems |
Serious | $2,500 | $1,625 | Apr 1, 2009 | Closed |
| Citation 1, item 2b 29 CFR 1926.503(a)(1) · Fall protection training in construction |
Serious | $0 | $0 | Apr 1, 2009 | Closed |
| Citation 1, item 3a 29 CFR 1926.1053(b)(1) · Ladders in construction |
Serious | $1,250 | $750 | Apr 1, 2009 | Closed |
| Citation 1, item 3b 29 CFR 1926.1060(a) · Ladder and stairway training |
Serious | $0 | $0 | Apr 1, 2009 | Closed |
Highway 157, Cullman, AL 35058 · Structural Steel and Precast Concrete Contractors · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1926.453(b)(2)(iv) · Aerial lifts |
Serious | $2,500 | $1,575 | May 21, 2007 | Closed |
| Citation 1, item 2 29 CFR 1926.453(b)(2)(v) · Aerial lifts |
Serious | $2,500 | $1,575 | May 21, 2007 | Closed |
| Citation 1, item 3 29 CFR 1926.502(d)(23) · Fall protection systems |
Serious | $1,250 | $850 | May 21, 2007 | Closed |
11700 South Memorial Parkway, Huntsville, AL 35801 · Structural Steel and Precast Concrete Contractors · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1926.760(b)(3) · Fall protection |
Repeat | $4,000 | $4,000 | Dec 8, 2003 | Closed |
11700 South Memorial Parkway, Huntsville, AL 35801 · Structural Steel and Precast Concrete Contractors · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1926.451(c)(2)(iv) · Scaffolds, general requirements |
Serious | $1,000 | $1,000 | Sep 30, 2003 | Closed |
| Citation 1, item 2 29 CFR 1926.760(b)(3) · Fall protection |
Serious | $2,000 | $2,000 | Sep 30, 2003 | Closed |
915 Stewart St. Oxford High Media Center, Oxford, AL 36260 · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1926.453(b)(2)(v) · Aerial lifts |
Serious | $2,000 | $2,000 | Aug 28, 2002 | Closed |
| Citation 1, item 2 29 CFR 1926.501(b)(11) · Fall protection in construction |
Serious | $2,000 | $2,000 | Aug 28, 2002 | Closed |
From the Form 300A summaries employers file with OSHA each year. Rate = recordable cases per 100 full-time workers.
In 2023, the Birmingham site logged 1 recordable injury or illness among about 67 workers: 1.5 per 100 full-time workers, against a median of 2.8 for its industry.
| Site and year | Workers | Cases | Days-away cases | Rate | Industry median |
|---|---|---|---|---|---|
| BIrmingham & Associates, Inc. Birmingham · 2023 | 67 | 1 | 0 | 1.5 | 2.8 |
| Birmingham & Associates Inc Birmingham · 2017 | 64 | 1 | 0 | 2.3 | 2.8 |
Included with any plan: 2 more yearly logs from these sites, back to 2016, with each site's average rate over its latest three years. Already a subscriber? Sign in.
See plansEmployers must report any work-related amputation, in-patient hospitalization or loss of an eye to OSHA within 24 hours. 1 report on file.
Jul 13, 2021, Birmingham: Hospitalization · fractures · multiple body parts, n.e.c.
The injured employee was putting on skylight covers and fell 24 feet to the ground. The employee sustained a broken arm, leg, and pelvis. Fall protection was not connected at the time.
Current text from the Code of Federal Regulations. Some citations were issued under older wording.
29 CFR 1926.1053(b)(1)
(1) When portable ladders are used for access to an upper landing surface, the ladder side rails shall extend at least 3 feet (.9 m) above the upper landing surface to which the ladder is used to gain access; or, when such an extension is not possible because of the ladder's length, then the ladder shall be secured at its top to a rigid support that will not deflect, and a grasping device, such as a grabrail, shall be provided to assist employees in mounting and dismounting the ladder. In no case shall the extension be such that ladder deflection under a load would, by itself, cause the ladder to slip off its support.
29 CFR 1926.1060(a)
(a) The employer shall provide a training program for each employee using ladders and stairways, as necessary. The program shall enable each employee to recognize hazards related to ladders and stairways, and shall train each employee in the procedures to be followed to minimize these hazards.
29 CFR 1926.451(c)(2)(iv)
(iv) Front-end loaders and similar pieces of equipment shall not be used to support scaffold platforms unless they have been specifically designed by the manufacturer for such use.
Alert subscribers get notified of each newly cited employer in Alabama the morning it is posted. See the alert plans.
Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.