Inspection 341110492 OPENED DEC 9, 2015Closed
122 Ac Moore Drive, Berlin, NJ 08009 · Other Concrete Product Manufacturing · OSHA's record · Phone and website on Google Maps
Incident on Dec 9, 2015 (fatal): Employee is killed when run over by a concrete forklift
At 1:00 p.m. on December 9, 2015, an employee was run over by a forklift that was carrying a full bucket of concrete. The forklift driver was unable to see over the bucket while he was moving. The employee was killed from multiple injuries.
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1a 29 CFR 1910.110(f)(2)(i) · Storage and handling of liquefied petroleum gases |
Serious | $2,800 | $2,240 | Jun 8, 2016 | Final |
| Citation 1, item 1b 29 CFR 1910.253(b)(2)(ii) · Gas welding and cutting |
Serious | $0 | $0 | Jun 8, 2016 | Final |
| Citation 1, item 2 29 CFR 1910.132(h)(1) · Personal protective equipment, general requirements |
Serious | $3,500 | $2,800 | Jun 8, 2016 | Final |
| Citation 1, item 3 29 CFR 1910.133(a)(1) · Eye and face protection |
Serious | $2,800 | $2,240 | Jun 8, 2016 | Final |
| Citation 1, item 4 29 CFR 1910.132(a) · Personal protective equipment, general requirements |
Serious | $2,800 | $2,240 | Jun 8, 2016 | Final |
| Citation 1, item 5 29 CFR 1910.138(a) · Gloves and hand protection |
Serious | $3,500 | $2,800 | Jun 8, 2016 | Final |
| Citation 1, item 6a 29 CFR 1910.147(c)(4)(i) · Lockout/tagout |
Serious | $4,900 | $3,920 | Jun 8, 2016 | Final |
| Citation 1, item 6b 29 CFR 1910.147(c)(7)(i) · Lockout/tagout |
Serious | $0 | $0 | Jun 8, 2016 | Final |
| Citation 1, item 7 29 CFR 1910.178(l)(1)(i) · Forklifts and other powered industrial trucks |
Serious | $7,000 | $5,600 | Jun 8, 2016 | Final |
| Citation 1, item 8 29 CFR 1910.178(n)(4) · Forklifts and other powered industrial trucks |
Serious | $7,000 | $5,600 | Jun 8, 2016 | Final |
| Citation 1, item 9 29 CFR 1910.178(q)(7) · Forklifts and other powered industrial trucks |
Serious | $4,900 | $4,200 | Jun 8, 2016 | Final |
| Citation 1, item 10a 29 CFR 1910.179(j)(2)(iv) · Overhead and gantry cranes |
Serious | $4,900 | $3,920 | Jun 8, 2016 | Final |
| Citation 1, item 10b 29 CFR 1910.179(j)(3) · Overhead and gantry cranes |
Serious | $0 | $0 | Jun 8, 2016 | Final |
| Citation 1, item 11 29 CFR 1910.179(l)(3)(iii)(d) · Overhead and gantry cranes |
Serious | $2,800 | $2,240 | Jun 8, 2016 | Final |
| Citation 1, item 12 29 CFR 1910.179(n)(3)(iii)(b) · Overhead and gantry cranes |
Serious | $4,200 | $3,360 | Jun 8, 2016 | Final |
| Citation 1, item 13 29 CFR 1910.303(b)(7)(iv) · Electrical equipment, general requirements |
Serious | $2,100 | $1,680 | Jun 8, 2016 | Final |
| Citation 1, item 14 29 CFR 1910.305(b)(1)(ii) · Electrical wiring methods |
Serious | $2,100 | $0 | Jun 8, 2016 | Final |
| Citation 2, item 1 29 CFR 1910.146(c)(2) · Permit-required confined spaces |
Repeat | $7,000 | $5,600 | Jun 8, 2016 | Final |
| Citation 2, item 2 29 CFR 1910.146(c)(4) · Permit-required confined spaces |
Repeat | $7,000 | $6,300 | Jun 8, 2016 | Final |
| Citation 2, item 3 29 CFR 1910.253(b)(4)(iii) · Gas welding and cutting |
Repeat | $7,000 | $6,300 | Jun 8, 2016 | Final |
| Citation 3, item 1 29 CFR 1910.212(b) · Machine guarding |
Other-than-serious | $0 | $0 | Jun 8, 2016 | Final |