OSHA SearchOSHA records by employer

Bonneville Power Adminstration Ross Transmission Services: OSHA inspections and violations

Vancouver, Washington · Electric Power Distribution · NAICS 221122

1inspections
12citation items
$0current penalties
Feb 23, 2016last inspection

OSHA inspectors have visited Bonneville Power Adminstration Ross Transmission Services in Washington one time.

It opened on Feb 23, 2016 as a planned inspection, in Vancouver.

In all, OSHA issued 12 citation items: 11 serious and 1 other-than-serious.

No penalty came with these citations.

The rule cited most here is 1910.107 (spray painting and finishing), 4 times.

Among utility employers, the typical cited inspection since 2015 ends with a $0 penalty. Bonneville Power Adminstration Ross Transmission Services averages $0 across 1 cited inspection.

Bonneville Power Adminstration Ross Transmission Services: OSHA citation items per year, 2016 to 2016
Citation items per year, by inspection date.

Washington · latest 90 days of OSHA records

1,042employers cited

3 of them in the same industry

Get notified the morning OSHA posts each new citation in Washington: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Washington

Checking a subcontractor, a client or your own company? Watch Bonneville Power Adminstration Ross Transmission Services and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 341337228 OPENED FEB 23, 2016Closed

Planned · Complete · Health · Federal government · 800 employees at the site · Closed Nov 8, 2016

5411 Ne Hwy 99, Vancouver, WA 98666 · Electric Power Distribution · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.22(d)(1) · General requirements
Serious$0$0Jun 23, 2016Final
Citation 1, item 2
29 CFR 1910.23(b)(1) · Guarding floor and wall openings and holes
Serious$0$0Jun 23, 2016Final
Citation 1, item 3
29 CFR 1910.107(b)(2) · Spray painting and finishing
Serious$0$0Jun 23, 2016Final
Citation 1, item 4
29 CFR 1910.107(b)(9) · Spray painting and finishing
Serious$0$0Jun 23, 2016Final
Citation 1, item 5
29 CFR 1910.107(c)(2) · Spray painting and finishing
Serious$0$0Jun 23, 2016Final
Citation 1, item 6
29 CFR 1910.107(g)(2) · Spray painting and finishing
Serious$0$0Jun 23, 2016Final
Citation 1, item 7
29 CFR 1910.215(b)(9) · Grinders and abrasive wheels
Serious$0$0Jun 23, 2016Final
Citation 1, item 8a
29 CFR 1910.303(b)(2) · Electrical equipment, general requirements
Serious$0$0Jun 23, 2016Final
Citation 1, item 8b
29 CFR 1910.304(b)(4)(ii)(b) · Grounding and circuit protection
Serious$0$0Jun 23, 2016Final
Citation 1, item 9a
29 CFR 1910.305(b)(1)(i) · Electrical wiring methods
Serious$0$0Jun 23, 2016Final
Citation 1, item 9b
29 CFR 1910.305(g)(2)(iii) · Electrical wiring methods
Serious$0$0Jun 23, 2016Final
Citation 2, item 1
29 CFR 1910.1200(f)(5) · Hazard communication
Other-than-serious$0$0Jun 23, 2016Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.107 · Spray painting and finishing

29 CFR 1910.107(b)(2)

(2) Interiors. The interior surfaces of spray booths shall be smooth and continuous without edges and otherwise designed to prevent pocketing of residues and facilitate cleaning and washing without injury.

29 CFR 1910.107(b)(9)

(9) Cleaning. Spray booths shall be so installed that all portions are readily accessible for cleaning. A clear space of not less than 3 feet on all sides shall be kept free from storage or combustible construction.

29 CFR 1910.107(c)(2)

(2) Minimum separation. There shall be no open flame or spark producing equipment in any spraying area nor within 20 feet thereof, unless separated by a partition.

29 CFR 1910.1200 · Hazard communication

29 CFR 1910.215 · Grinders and abrasive wheels

29 CFR 1910.22 · General requirements

29 CFR 1910.23 · Guarding floor and wall openings and holes

29 CFR 1910.303 · Electrical equipment, general requirements

29 CFR 1910.304 · Grounding and circuit protection

29 CFR 1910.305 · Electrical wiring methods

Other electric power distribution employers in Washington

Alert subscribers get notified of each newly cited employer in Washington the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.