OSHA SearchOSHA records by employer

Bosco Building LLC: OSHA inspections and violations

Minneapolis, Minnesota · Site Preparation Contractors · NAICS 238910

3inspections
14citation items
$4,556current penalties
Nov 14, 2018last inspection

Since 2013, OSHA inspectors have visited Bosco Building LLC in Minnesota 3 times.

The most recent inspection opened on Nov 14, 2018 as a planned inspection, in Minneapolis.

In all, OSHA issued 14 citation items: 13 serious and 1 other-than-serious.

The proposed penalties came to $5,700; today they stand at $4,556, 20% less.

The rule cited most here is 1926.62 (lead in construction), 6 times.

Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. Bosco Building LLC averages $2,250 across 1 cited inspection.

Bosco Building LLC: OSHA citation items per year, 2013 to 2018
Citation items per year, by inspection date.

Minnesota · latest 90 days of OSHA records

380employers cited

Get notified the morning OSHA posts each new citation in Minnesota: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Minnesota

Checking a subcontractor, a client or your own company? Watch Bosco Building LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 343610309 OPENED NOV 14, 2018Closed

Planned · Complete · Safety · 6 employees at the site · Closed Mar 11, 2020

2929 27th Ave S, Minneapolis, MN 55406 · Other Foundation, Structure, and Building Exterior Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.501(b)(1) · Fall protection in construction
Serious$675$675Nov 30, 2018Final
Citation 1, item 2
29 CFR 1926.503(a)(1) · Fall protection training in construction
Serious$675$675Nov 30, 2018Final
Citation 1, item 3
29 CFR 1926.1051(a) · Stairways and Ladders: general requirements
Serious$225$225Nov 30, 2018Final
Citation 1, item 4 Serious$675$675Nov 30, 2018Final

Inspection 316940972 OPENED FEB 7, 2013Closed

Planned · Complete · Safety · 3 employees at the site · Closed Jul 22, 2013

3733 43rd Ave S, Minneapolis, MN 55406 · Site Preparation Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.451(b)(1) · Scaffolds, general requirements
Serious$375$262Mar 19, 2013Final
Citation 1, item 3
29 CFR 1926.451(h)(2) · Scaffolds, general requirements
Other-than-serious$375$244Mar 19, 2013Final

Inspection 316955640 OPENED FEB 7, 2013Closed

Planned · Complete · Health · 3 employees at the site · Closed Jul 22, 2013

3733 43rd Ave S, Minneapolis, MN 55406 · Site Preparation Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.62(d)(1)(i) · Lead in construction
Serious$450$300Mar 19, 2013Final
Citation 1, item 3a
29 CFR 1926.62(d)(2)(ve) · Lead in construction
Serious$450$300Mar 19, 2013Final
Citation 1, item 3b
29 CFR 1926.62(j)(1)(i) · Lead in construction
Serious$0$0Mar 19, 2013Closed
Citation 1, item 4a
29 CFR 1926.62(d)(2)(vf) · Lead in construction
Serious$450$300Mar 19, 2013Final
Citation 1, item 4b
29 CFR 1926.62(l)(1)(i) · Lead in construction
Serious$0$0Mar 19, 2013Closed
Citation 1, item 5
29 CFR 1926.62(f)(2)(i) · Lead in construction
Serious$450$300Mar 19, 2013Final
Citation 1, item 6
29 CFR 1926.1101(f)(2)(i) · Asbestos in construction
Serious$450$300Mar 19, 2013Final
Citation 1, item 7
29 CFR 1926.1101(g)(1)(ii) · Asbestos in construction
Serious$450$300Mar 19, 2013Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.1051 · Stairways and Ladders: general requirements

29 CFR 1926.1051(a)

(a) A stairway or ladder shall be provided at all personnel points of access where there is a break in elevation of 19 inches (48 cm) or more, and no ramp, runway, sloped embankment, or personnel hoist is provided.

29 CFR 1926.1101 · Asbestos in construction

29 CFR 1926.1101(f)(2)(i)

(2) Initial Exposure Assessment. (i) Each employer who has a workplace or work operation covered by this standard shall ensure that a “competent person” conducts an exposure assessment immediately before or at the initiation of the operation to ascertain expected exposures during that operation or workplace. The assessment must be completed in time to comply with requirements which are triggered by exposure data or the lack of a “negative exposure assessment,” and to provide information necessary to assure that all control systems planned are appropriate for that operation and will work properly.

29 CFR 1926.1101(g)(1)(ii)

(ii) Wet methods, or wetting agents, to control employee exposures during asbestos handling, mixing, removal, cutting, application, and cleanup, except where employers demonstrate that the use of wet methods is infeasible due to for example, the creation of electrical hazards, equipment malfunction, and, in roofing, except as provided in paragraph (g)(8)(ii) of this section; and

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.501 · Fall protection in construction

29 CFR 1926.503 · Fall protection training in construction

29 CFR 1926.62 · Lead in construction

29 CFR 5207.1100

Other site preparation contractors employers in Minnesota

Alert subscribers get notified of each newly cited employer in Minnesota the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.