OSHA SearchOSHA records by employer

Bottle Breacher LLC: OSHA inspections and violations

Tucson, Arizona · All Other Miscellaneous Fabricated Metal Product Manufacturing · NAICS 332999

1inspections
10citation items
$4,000current penalties
Jul 28, 2021last inspection

Bottle Breacher LLC has one OSHA inspection on record in Arizona.

OSHA opened it on Jul 28, 2021 as a planned inspection, in Tucson.

From that inspection OSHA issued 10 citation items: 7 serious and 3 other-than-serious.

OSHA proposed $4,000 in penalties and the amount has not been reduced.

Most often, OSHA cited 1910.107, spray painting and finishing (4 items).

For context, across all manufacturing employers the median penalty per cited inspection since 2015 is $3,600. Bottle Breacher LLC averages $4,000 over 1 cited inspection in that time.

Bottle Breacher LLC: OSHA citation items per year, 2021 to 2021
Citation items per year, by inspection date.

Arizona · latest 90 days of OSHA records

85employers cited

Get notified the morning OSHA posts each new citation in Arizona: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Arizona

Checking a subcontractor, a client or your own company? Watch Bottle Breacher LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 345444640 OPENED JUL 28, 2021Closed

Planned · Complete · Health · 8 employees at the site · Closed May 26, 2022

1870 W Prince Rd #35, Tucson, AZ 85705 · All Other Miscellaneous Fabricated Metal Product Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1910.107(b)(5)(i) · Spray painting and finishing
Serious$1,000$1,000Sep 17, 2021Final
Citation 1, item 1b
29 CFR 1910.107(b)(5)(iv) · Spray painting and finishing
Serious$0$0Sep 17, 2021Final
Citation 1, item 1c
29 CFR 1910.107(b)(9) · Spray painting and finishing
Serious$0$0Sep 17, 2021Final
Citation 1, item 1d
29 CFR 1910.107(c)(8) · Spray painting and finishing
Serious$0$0Sep 17, 2021Final
Citation 1, item 2
29 CFR 1910.132(d)(2) · Personal protective equipment, general requirements
Serious$1,000$1,000Sep 17, 2021Final
Citation 1, item 3
29 CFR 1910.134(c)(1) · Respiratory protection
Serious$1,000$1,000Sep 17, 2021Final
Citation 1, item 4
29 CFR 1910.147(c)(1) · Lockout/tagout
Serious$1,000$1,000Sep 17, 2021Final
Citation 2, item 1
29 CFR 1910.37(b)(2) · Exit routes
Other-than-serious$0$0Sep 17, 2021Final
Citation 2, item 2
29 CFR 1910.101(b) · Compressed gases (general requirements)
Other-than-serious$0$0Sep 17, 2021Final
Citation 2, item 3
29 CFR 1910.305(g)(1)(iv)(a) · Electrical wiring methods
Other-than-serious$0$0Sep 17, 2021Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.101 · Compressed gases (general requirements)

29 CFR 1910.101(b)

(b) Compressed gases. The in-plant handling, storage, and utilization of all compressed gases in cylinders, portable tanks, rail tankcars, or motor vehicle cargo tanks shall be in accordance with Compressed Gas Association Pamphlet P-1-1965, which is incorporated by reference as specified in § 1910.6.

29 CFR 1910.107 · Spray painting and finishing

29 CFR 1910.107(b)(5)(i)

(i) The spraying operations except electrostatic spraying operations shall be so designed, installed and maintained that the average air velocity over the open face of the booth (or booth cross section during spraying operations) shall be not less than 100 linear feet per minute. Electrostatic spraying operations may be conducted with an air velocity over the open face of the booth of not less than 60 linear feet per minute, or more, depending on the volume of the finishing material being applied and its flammability and explosion characteristics. Visible gauges or audible alarm or pressure activated devices shall be installed to indicate or insure that the required air velocity is maintained. Filter rolls shall be inspected to insure proper replacement of filter media.

29 CFR 1910.107(b)(5)(iv)

(iv) Space within the spray booth on the downstream and upstream sides of filters shall be protected with approved automatic sprinklers.

29 CFR 1910.132 · Personal protective equipment, general requirements

29 CFR 1910.134 · Respiratory protection

29 CFR 1910.147 · Lockout/tagout

29 CFR 1910.305 · Electrical wiring methods

29 CFR 1910.37 · Exit routes

Other all other miscellaneous fabricated metal product manufacturing employers in Arizona

Alert subscribers get notified of each newly cited employer in Arizona the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.