OSHA SearchOSHA records by employer

Bridgehampton Steel & Welding, Inc: OSHA inspections and violations

Bridgehampton, New York · Structural Steel and Precast Concrete Contractors · NAICS 238120

2inspections
8citation items
$12,000current penalties
Jul 31, 2019last inspection

OSHA has inspected Bridgehampton Steel & Welding, Inc 2 times in New York since 2015.

The latest one began on Jul 31, 2019 after a complaint, in Bridgehampton.

Those inspections ended with 8 citation items: 8 serious.

Penalties were first proposed at $15,826 and now stand at $12,000, 24% lower after settlements or reviews.

Inspections comes up most often in these citations: 3 items under 1926.1412.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and Bridgehampton Steel & Welding, Inc averages $6,000 (2 cited inspections).

Bridgehampton Steel & Welding, Inc: OSHA citation items per year, 2015 to 2019
Citation items per year, by inspection date.

New York · latest 90 days of OSHA records

362employers cited

Get notified the morning OSHA posts each new citation in New York: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in New York

Checking a subcontractor, a client or your own company? Watch Bridgehampton Steel & Welding, Inc and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 344205828 OPENED JUL 31, 2019Closed

Complaint · Partial · Safety · 11 employees at the site · Closed Feb 18, 2020

27 Foster Ave, Bridgehampton, NY 11932 · Fabricated Structural Metal Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.253(b)(2)(iv) · Gas welding and cutting
Serious$2,313$1,500Jan 29, 2020Final
Citation 1, item 2
29 CFR 1910.253(b)(4)(iii) · Gas welding and cutting
Serious$2,313$1,500Jan 29, 2020Final

Inspection 340560655 OPENED APR 15, 2015Closed

Referral · Partial · Safety · 3 employees at the site · Closed Dec 10, 2015

260 Ocean Road, Bridgehampton, NY 11932 · Structural Steel and Precast Concrete Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.752(b) · Site layout, site-specific erection plan and construction sequence
Serious$2,800$2,250Oct 13, 2015Final
Citation 1, item 2a
29 CFR 1926.1412(f)(1) · Inspections
Serious$2,800$2,250Oct 13, 2015Final
Citation 1, item 2b
29 CFR 1926.1412(e)(1) · Inspections
Serious$0$0Oct 13, 2015Final
Citation 1, item 2c
29 CFR 1926.1412(d)(1) · Inspections
Serious$0$0Oct 13, 2015Final
Citation 1, item 3 Serious$2,800$2,250Oct 13, 2015Final
Citation 1, item 4
29 CFR 1926.1419(a)(1) · Signals—general requirements
Serious$2,800$2,250Oct 13, 2015Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.253 · Gas welding and cutting

29 CFR 1910.253(b)(2)(iv)

(iv) Valve protection caps, where cylinder is designed to accept a cap, shall always be in place, hand-tight, except when cylinders are in use or connected for use.

29 CFR 1910.253(b)(4)(iii)

(iii) Oxygen cylinders in storage shall be separated from fuel-gas cylinders or combustible materials (especially oil or grease), a minimum distance of 20 feet (6.1 m) or by a noncombustible barrier at least 5 feet (1.5 m) high having a fire-resistance rating of at least one-half hour.

29 CFR 1926.1412 · Inspections

29 CFR 1926.1412(d)(1)

(d) Each shift. (1) A competent person must begin a visual inspection prior to each shift the equipment will be used, which must be completed before or during that shift. The inspection must consist of observation for apparent deficiencies. Taking apart equipment components and booming down is not required as part of this inspection unless the results of the visual inspection or trial operation indicate that further investigation necessitating taking apart equipment components or booming down is needed. Determinations made in conducting the inspection must be reassessed in light of observations made during operation. At a minimum the inspection must include all of the following:

29 CFR 1926.1417 · Operation

29 CFR 1926.1419 · Signals—general requirements

29 CFR 1926.752 · Site layout, site-specific erection plan and construction sequence

Other structural steel and precast concrete contractors employers in New York

Alert subscribers get notified of each newly cited employer in New York the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.