OSHA SearchOSHA records by employer

Brite-Lite Electrical Co., Inc.: OSHA inspections and violations

Hanover, Massachusetts · Electrical Contractors and Other Wiring Installation Contractors · NAICS 238210

5inspections
4citation items
$4,872current penalties
Sep 25, 2026last inspection

Brite-Lite Electrical Co., Inc. has 5 OSHA inspections on record in Massachusetts, the first in 2000.

OSHA's last visit started on Sep 25, 2026, in New Bedford.

Across those inspections OSHA issued 4 citation items: 3 serious and 1 other-than-serious.

OSHA proposed $6,197 in penalties. After settlements and reviews the total is $4,872, down 21%.

Most often, OSHA cited 1926.405, job-site wiring (2 items).

For context, across all construction employers the median penalty per cited inspection since 2015 is $3,080. Brite-Lite Electrical Co., Inc. averages $3,547 over 1 cited inspection in that time.

Brite-Lite Electrical Co., Inc.: OSHA citation items per year, 2000 to 2026
Citation items per year, by inspection date.

Massachusetts · latest 90 days of OSHA records

247employers cited

4 of them in the same industry

Get notified the morning OSHA posts each new citation in Massachusetts: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Massachusetts

Checking a subcontractor, a client or your own company? Watch Brite-Lite Electrical Co., Inc. and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 349185264 OPENED SEP 25, 2026Closed

Inspection · Partial · Safety · 23 employees at the site · Closed Nov 4, 2026

1213 Purchase Street, New Bedford, MA 02740 · Electrical Contractors and Other Wiring Installation Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.453(b)(2)(v) · Aerial lifts
Serious$3,547$3,547Oct 9, 2026Final

Inspection 339413544 OPENED SEP 10, 2013Closed

Planned · Complete · Safety · 2 employees at the site · Closed Sep 11, 2013

50 School Street, Brookline, MA 02445 · Electrical Contractors and Other Wiring Installation Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 308109784 OPENED AUG 17, 2005Closed

Unprogrammed related · Complete · Safety · 30 employees at the site · Closed Feb 6, 2006

1 Learning Lane, Pembroke, MA 02359 · Electrical Contractors and Other Wiring Installation Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 2
29 CFR 1926.405(b)(2) · Job-site wiring
Serious$900$450Jan 13, 2006Closed

Inspection 305547333 OPENED FEB 20, 2003Closed

Unprogrammed related · Complete · Safety · 4 employees at the site · Closed Apr 22, 2003

Brown Street, Attleboro, MA 02703 · Electrical Contractors and Other Wiring Installation Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.403(d)(1) · Electrical equipment on job sites
Other-than-serious$750$375Mar 31, 2003Closed
Citation 1, item 2
29 CFR 1926.405(b)(1) · Job-site wiring
Serious$1,000$500Mar 31, 2003Closed

Inspection 302919311 OPENED FEB 8, 2000Closed

Planned · Complete · Safety · 1 employee at the site · Closed Feb 8, 2000

45 Whiting Street, Hanover, MA 02339 · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.403 · Electrical equipment on job sites

29 CFR 1926.403(d)(1)

(d) Mounting and cooling of equipment—(1) Mounting. Electric equipment shall be firmly secured to the surface on which it is mounted. Wooden plugs driven into holes in masonry, concrete, plaster, or similar materials shall not be used.

29 CFR 1926.405 · Job-site wiring

29 CFR 1926.405(b)(1)

(b) Cabinets, boxes, and fittings—(1) Conductors entering boxes, cabinets, or fittings. Conductors entering boxes, cabinets, or fittings shall be protected from abrasion, and openings through which conductors enter shall be effectively closed. Unused openings in cabinets, boxes, and fittings shall also be effectively closed.

29 CFR 1926.405(b)(2)

(2) Covers and canopies. All pull boxes, junction boxes, and fittings shall be provided with covers. If metal covers are used, they shall be grounded. In energized installations each outlet box shall have a cover, faceplate, or fixture canopy. Covers of outlet boxes having holes through which flexible cord pendants pass shall be provided with bushings designed for the purpose or shall have smooth, well-rounded surfaces on which the cords may bear.

29 CFR 1926.453 · Aerial lifts

Other electrical contractors and other wiring installation contractors employers in Massachusetts

Alert subscribers get notified of each newly cited employer in Massachusetts the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.